Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T07CM00524
Review Name: RESUBMITTAL - SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/25/2007 | ANDREW CONNOR | NPPO | REVIEW | Approv-Cond | |
| 04/26/2007 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: April 26, 2007 SUBJECT: 3180 W Mockingbird Lane (T06SA00107) Engineering Resubmittal Review REVIEWER: Elizabeth Eberbach ACTIVITY NUMBER: T07BU00332, T07CM0524 SUMMARY: The residential grading plan, overlay site plan, prepared by Stantec, and the associated HDZ Overlay approval document, were reviewed by Engineering and owner at a meeting on 26APR07. Engineering recommends approval of the grading plan. For questions, call me at 837-4934. GRADING PERMIT CONDITIONS: The following 7 conditions apply to the grading permit T07BU00332: 1) Call for Pre-construction meeting. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) A copy of the Grading Plan and Grading Permit shall be kept at the site at all times, until final grading approval. 3) Any revision to the Grading Plan MAY require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design. 4) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 5) Separate building permit applications are required for any walls. 6) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. 7) There shall be no disturbance outside of the disturbance/grading limits. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 04/26/2007 | STEVE SHIELDS | ZONING | REVIEW | Approved |