Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T07CM00480
Parcel: 107020120

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T07CM00480
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
01/18/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: January 18, 2008
ACTIVITY NUMBER: T07CM00480
PROJECT NAME: Knittel Commercial Warehouse Buildings Project
PROJECT ADDRESS: 3178 North Freeway Industrial
PROJECT REVIEWER: Bianca Ramirez, Engineering Associate

The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: SITE PLAN

DRAINAGE REPORT APPROVED

1. Site plan cannot be approved until recordation information (Docket and Page) has been provided on the plans. Temporary construction easement has been acknowledged however, appropriate documentation with the next submittal and include the recordation data on the site and grading plan.

2. The above comment is from the previous review. The response to this comment was that the offsite work has been eliminated and the construction easement is still proposed. However the site plan still shows off site grading. Clarify in detail in the response letter and on the site plan if off site work is proposed or not. If there is proposed offsite work show on the plan and provide the recordation data for the construction easement. Clarify on the plan if public or private.