Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T07CM00480
Parcel: 107020120

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T07CM00480
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/07/2007 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: T07CM00480
3178 N. Freeway Industrial Loop
Site Plan

TRANSMITTAL: 08/08/07

COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. DS 2-02.2.1.12 Clearly indicate that all sidewalks are physically separated from vehicular use areas. It appears that garage doors will be installed in all buildings on the south side. If this is the case handicap ramps and crosswalks will be required at the sidewalks where they cross in front of the proposed garage doors. Truncated domes are required when transitioning from the pedestrian path to a vehicular use area (on each side of the ramp to the garage doors).

2. A continuous pedestrian circulation path is required between all buildings. Not completed between buildings 2 and 3.

3. These comments are minor in nature and the review can be completed by setting an appointment with me for an over the counter review.


If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961
08/08/2007 TERRY STEVENS ZONING HC SITE REVIEW Denied see zoning comments
08/22/2007 PATRICIA GILBERT ENGINEERING REVIEW Denied DATE: August 27, 2007
ACTIVITY NUMBER: T07CM00480
PROJECT NAME: Knittel Commercial Warehouse Buildings Project
PROJECT ADDRESS: 3178 North Freeway Industrial
PROJECT REVIEWER: Patricia Gilbert, Engineering Associate

The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: SITE PLAN

DRAINAGE REPORT APPROVED

1. The revised site plan now shows off site work on the southeast side of the property. Be advised written permission form the owner and a temporary construction easement will be required for the off site work. Provide appropriate documentation with the next submittal and include the recordation data on the site and grading plan.

The above comment is from the previous review. The response to this comment was that the offsite work has been eliminated and the construction easement is still proposed. However the site plan still shows off site grading. Clarify in detail in the response letter and on the site plan if off site work is proposed or not. If there is proposed offsite work show on the plan and provide the recordation data for the construction easement. Clarify on the plan if public or private.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/31/2007 CINDY AGUILAR OUT TO CUSTOMER Completed
08/31/2007 SUE REEVES REJECT SHELF Completed