Permit Review Detail
Review Status: Active
Review Details: RESUBMITTAL
Permit Number - T07CM00323
Review Name: RESUBMITTAL
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/15/2007 | WILDAN | 2ND PARTY REVIEW | REVIEW | Denied | May 15, 2007 City of Tucson Development Services 201 N. Stone Avenue Tucson, AZ 85701 RE: HADSELL ENCLOSURE AND ADDITION – 3rd REVIEW CITY OF TUCSON LOG NO. T07CM00323 WILLDAN PROJECT NO. 13881-7012 The third review for the above project has been completed. This letter contains comments which need to be addressed by written responses to each which indicate any actions taken. In order to facilitate a shorter second review, all corrections and revisions must be made on the original plans and two complete new sets of prints, along with one complete redlined set, must be returned to our office. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets, and that all changes have been highlighted with appropriate revision numbers, revision dates, and “cloud bubbles.” Pen or pencil corrections on final prints are not acceptable. This project has been reviewed for conformance with the 2003 IRC, 1997 UAC, 2003 IMC, 2003 IECC, 2002 NEC codes with local modifications, and the 2003 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan. Should you have questions regarding the comments herein, please contact your plans examiner Antonio Moya. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms Dwelling (exist.) New Workshop New Dwelling New Porch N/A VB 1,003 187 766 332 No Smoke Special Inspections Required: Epoxy foundation anchors Acceptable Deferred Submittal Items: Pre manufactured truss drawings GENERAL COMMENTS: Reviewed and accepted. ARCHITECTURAL COMMENTS: Reviewed and accepted. STRUCTURAL COMMENTS: Reviewed and accepted. PLUMBING COMMENTS: Sheet 8 Waterline: Provide the total fixture unit demand (based on Tables 6-4 & 7-3 or Tables L-1 & L-2) including new and existing fixtures, and the maximum developed length. Reference UPC Section 610. COMMENT REMAINS: Not addressed. MECHANICAL COMMENTS: Reviewed and accepted. ELECTRICAL COMMENTS: Reviewed and accepted. ENERGY CODE COMMENTS: Reviewed and accepted. Sincerely, WILLDAN Chris Kiel, C.B.O. Building Official CEK/jk |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/03/2007 | ANY | REJECT SHELF | RECEIVED |