Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T07CM00218
Parcel: 126100270

Review Status: Completed

Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG

Permit Number - T07CM00218
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/26/2007 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied CITY OF TUCSON DEVELOPMENT SERVICES
STRUCTURAL REVIEW COMMENTS

DATE: 2/27/07
ACTIVITY NUMBER: T07CM00218
PROJECT NAME: Carport addition
PROJECT ADDRESS:4302 E. Bryn Mawr Rd.
ARCHITECT / ENGINEER: John Erion
PROJECT REVIEWER: Christ Foreman


TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CHRISTY.FOREMA1@TUCSONAZ.GOV IF YOU CARE TO DISCUSS.

1) 1997 Uniform Administrative Code - section 302.5 Inspection and Observation Program. When special inspection is required by Section 306, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the building permit. The inspection program shall designate the portions of the work to have special inspection, the name or names of the individuals or firms who are to perform the special inspections and indicate the duties of the special inspectors.

The special inspector shall be employed by the owner , the engineer or architect of record, or an agent of the owner, but not the contractor or any other person responsible for the work.

When structural observation is required by Section 307, the inspection program shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur.

The inspection program shall include samples of inspection reports and provide time limits for submission of reports.


2) Justify integra wall bond beam location. Typically bond beam is at top of wall for this post tension design wall.
3) Justify connection of plate to existing integra wall. Connection plate please clarify do you mean a flange. It appears the welds are carrying all the loads from rafters instead of ledger attached to existing integra wall.
4) Clarify roof slope per IRC 2003 - R905.10.
5) Permit and structural justification shall be required for the enclosure wall and steel gate if it exceeds the height of 6'-0" above finished grade.
6) Specify footing width on dtl 1/S2.0.
7) Provide lateral analysis for new structure attached to existing house.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/27/2007 GERARDO BONILLA OUT TO CUSTOMER Completed
03/27/2007 SUE REEVES REJECT SHELF Completed