Permit Number: T07CM00208
Parcel: 12710084B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T07CM00208
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/26/2007 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied 1) PROVIDE CODE ANALYSIS FOR ENTIRE BUILDING AND CLARIFY SEPERATED/NONSEPERATED USE.
2) RESTROOMS ARE NOT ACCESSIBLE PER 2003 ANSI A117.1.
3) PROVIDE SITE PLAN CLARIFYING ACCESSIBLE ROUTE INTO SPACE.
4) PROVIDE WATER FOUNTAIN.
5) CLARIFY SINK HEIGHTS KEYNOTE 6 FOR ANSI A117.1 COMPLIANCE.
6) PROVIDE 20% COST OF CONSTRUCTION BREAKDOWN ON PLANS PER SECTION 3409.6 OF 2003 IBC.
7) CORRECT APPLICABLE CODES TO REFLECT ANSI A117.1 INSTEAD OF ADAAG.
6) OCCUPANCY TYPE SPECIFIED IN PROJECT DATA IS INCORRECT, PLEASE CHANGE TO B.
01/26/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. If the appliances are provided with integral backflow devices, provide the 3rd party listing information that describes the backflow devices.
2. Provide maintenance access for the backflow asssemblies. If backflow assemblies are located greater than five feet high, provide a work platform for the assemblies. Reference Section 603.3.4, UPC 2003.
3. Revise the plumbing drawings to coordinate with the architectural plans and the plumbing floor plan.
4. The applicable code is the 2003 UPC with local amendments.
5. All fonts shall be a minimum of 1/8", all uppercase.
6. Show the installation of the drinking fountain.
7. Provide upper terminal cleanouts for all horizontal drain piping greater than five feet in length. Sinks require a cleanout if they have any horizontal drain piping. Reference Section 707.4, UPC 2003.
8. Each plumbing trap shall be provided with a vent. Reference Section 901.0, UPC 2003.
9. Show the size, route, and termination point of the combination temperature/pressure relief for the water heater.
01/26/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved
01/26/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide balancing data for the air conditioning system.
2. Air supplied to the nail area may not be recirculated. Reference Section 403.3 and Table 403.3, IMC 2003.
3. Provide ventilation for the wax room (i.e. provide a means for the air to return from the wax room).
4. Show how the air supplied to the restroom will not be recirculated. Reference Section 403.2, IMC 2003.
5. All fonts shall be a minimum of 1/8", all uppercase.
02/28/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
02/28/2007 FSANCHE1 WWM REVIEW Needs Review