Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07CM00069
Parcel: 12811424B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T07CM00069
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/05/2007 PATRICIA GILBERT ENGINEERING REVIEW Denied Provide two copies of the approved development plan, landscape and NPPO plans with the approved building plan set. A site application card (yellow card) with the CDRC approved development plan must be stamped with signatures for DSD site approval by the following reviewing sections; Fire, Zoning, Handi-cap, Engineering, Plumbing and Landscape/NPPO. The development plan may be walked through for stamps and site card sign off. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan.
09/06/2007 DAVID RIVERA ZONING REVIEW Denied 09/06/07

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. Zoning has reviewed the building plans but cannot approve them at this time. Prior to approval of the building plans the development plan must be re-stampeed as a site plan. See comment two.

2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

3. Zoning will re-review and approve the building plans on the next submittal providing the requested plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/14/2007 SUE REEVES OUT TO CUSTOMER Completed