Permit Number: T07CM00069
Parcel: 12811424B

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T07CM00069
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/20/2007 GERRY KOZIOL WWM REVIEW Denied NEEDS 8TH FLOOR WW CREDIT EVALUATION FOR DEMO OF EXSISTING STRUCTURE & REMOVAL OF TEMP MODULAR
02/20/2007 MARTIN BROWN FIRE REVIEW Approved
02/23/2007 ROBERT SHERRY WATER REVIEW Denied Revise the site drawing to show the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Note that Tucson Water does not provide ¾" water meters and that the water supply to the building is shown as 1" on sheet P1.0 and 1-1/4" on sheet P2.0. Reference Section 103.2.3, UPC 2003.
03/02/2007 SUZANNE BOHNET ENGINEERING REVIEW Denied Prior to building plan approval, a site application card (yellow card) with the CDRC approved development plan must be stamped with signatures for DSD site approval by the following reviewing sections; Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO. Provide two copies of the site approved development plan, landscape
and NPPO plans with the approved building plan set. The development plan may be walked through for stamps and site card sign off. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan.
03/08/2007 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Washington Federal Savings
T07CM00069
Building Plan (1st Review)

TRANSMITTAL DATE: March 8, 2007

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved Development plan.

3. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the building plan can be approved by Zoning. Two copies of the approved site/development plan, landscape and NPPO plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the site plans packet processed together for site approval.

4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.


If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 791-5608 ext. 1180.

C:\planning\grading\t07cm00069.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
03/19/2007 BETSY COTTLE COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
06/20/2007 GERARDO BONILLA OUT TO CUSTOMER Completed
06/20/2007 SUE REEVES REJECT SHELF Completed