Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T07CM00016
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/18/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Tucson Water will no longer allow water meters and backflow preventers to be manifolded to achieve additional capacity. 2. Revise the site utility plan to show the location of the reduced pressure backflow assembly on the drawings, specify the reduced pressure backflow assembly being installed, and indicate the size of the assembly. Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 06/19/2007 | MARTIN BROWN | FIRE | REVIEW | Denied | Please add the following automatic sprinkler criteria to the plans: 1. The hazard classification of the occupancy including any special hazards. 2. The design standard to be used. 3. The availability and adequacy of the water supply. 4. The design density and the area of operation. Also, note on Civil, Sheet 3, seems to indicate a 2" fire service line. Please review and verify will be large enough. |
| 06/21/2007 | SREEVES1 | WWM | REVIEW | Denied | 1:DESERT TOYOTA 2:NEEDS WASTEWATER IWC REVIEW-TOM TOMCHAK 579-5771 5025 W INA RD.(SAND/OIL INTERCEPTORS, RAINWATER INTURSION, ETC) CANNOT DISCHARE 2" ELEVATOR SUMP DRAIN TO FS SHOWN ON DRAWING P2.1C 3:NEED TO PERMIT ON-SITE PRIVATE SEWER-NEED DEQ APPROVAL TO CONSTRUCT IF OVER 3000 GAL/DAY-NEED WASTEWATER 8TH FLOOR APPROVAL FOR MANHOLE TAP (G-71-032) AND MANHOLE CONSTRUCTION (G-62-081) -NEED 5TH FLOOR MANHOLE CONSTRUCTION & MANHOLE TAP PERMIT- NEED COPY OF ON-SITE PRIVATE SEWER FOR BASE MAP UPDATE. 4:NEED 8TH FLOOR CREDIT EVALUATION FOR DEMO OF EXSISTING BLDGS PER DRAWINGS. |
| 06/21/2007 | TERRY STEVENS | ZONING | REVIEW | Denied | 06/21/07 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
| 07/06/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; East District; 61,523 Square Feet of Office Space; 27,641 Square Feet of Repair Facility; $173,547.33 * 126,980 Square Feet of Parking Garage not included in Impact Fee's |
| 07/27/2007 | MATT FLICK | ENGINEERING | REVIEW | Approved | The following comment has been satisfactorily addressed: Floodplain permit review approval required prior to post-3rd party review. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/31/2007 | THAUSER1 | OUT TO CUSTOMER | Completed |
| 07/31/2007 | SUE REEVES | REJECT SHELF | Completed |