Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T07CM00012
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/15/2007 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 3/15/2007 ACTIVITY NUMBER: T07CM00012 & T07CM00013 PROJECT NAME: Pantano Villas PROJECT ADDRESS:260 S. Pantano Rd. ARCHITECT / ENGINEER: Incite PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CHRISTY.FOREMA1@TUCSONAZ.GOV IF YOU CARE TO DISCUSS. 1) It appears this whole site is being renovated. Justify 20% cost of construction being spent towards accessibility requirements per code section 3409.6 IBC 2003. Provide itemized breakdown of costs for items on the drawings for the whole site. Clarify location of type "A" and type "B" units and how many are required per code. 2) Scope of work is unclear. Show building plan to clarify which units and type of unit are being modified. 3) Provide wall section for new interior walls. Provide structural calculations |
03/15/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Based on the site plan (sheet A1.0) the water for building 3 is supplied from 4 different water meters that are all much further than 60 feet from the furthest fixture in any apartment and all of them handle a greater demand than shown in the calculations. The presence of an expansion tank in the water heater schedule (sheet PD1.0) implies that a backflow prevention assembly may be in place in the water supply to the building; if so, include the pressure drop associated with the device in the calculations. Revise the calculations and, if needed, the pipe sizing. Reference Section 610.1, UPC 2003. 2. Provide shower and tub/shower control valves that comply with the requirements of Sections 420.0 and 421.0, UPC 2003. 3. Clarify the termination point of the T&P relief valve piping noted in detail 1/P1.1. Reference Sections 103.2.3 and 608.5, UPC 2003. 4. Show that the re-use of an existing T&P valve (as noted in detail 1/P1.0) complies with the manufacturer's listing for the valve. Reference Section 301.1.1, UPC 2003. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/19/2007 | VFLORES1 | OUT TO CUSTOMER | Completed |