Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING
Permit Number - T07BU02575
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/26/2008 | HEATHER THRALL | ZONING | REVIEW | Approved | |
| 07/01/2008 | PETER MCLAUGHLIN | NPPO | REVIEW | Approved | |
| 07/01/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: July 1, 2008 TO: Geoff Harris, PE REVIEWER: Elizabeth Eberbach, PE, CPM, CFM SUBJECT: Commercial Parking Lots: Site Plan and Grading Plan 2nd resubmittal reviews PROJECT: South Parking lot, south portion of parcel 140-42-0570 LOCATION: T15S R14E Sec17, Ward 5 ACTIVITY NUMBER: T07CM04647, T07BU02575 SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised site / grading plan submittal. Per previous response letter, the revisions to the north parking area site plan should be submitted separately to resolve deficiencies. Submit the sheets for the parking area to the north under these activity numbers T07OT00863 and T04BU02354 for plan review of the proposed solutions to the north parking area, to be addressed with separate review / violation notice. Engineering recommends approval of the proposed grading permit for the parking area south of the wash only. See the following conditions of the grading permit. APPROVAL CONDITIONS OF PERMIT: THE FOLLOWING 17 CONDITIONS APPLY TO PERMIT T07BU02575: 1) CALL FOR PRE-CONSTRUCTION MEETING, INTERMEDIATE AND FINAL INSPECTIONS. FOR A DSD ENGINEERING INSPECTION, CALL IVR (740-6970), OR CONTACT DSD ENGINEERING AT 837-4888, OR SCHEDULE INSPECTIONS ONLINE AT: HTTP://WWW.CI.TUCSON.AZ.US/DSD/ONLINE_SERVICES/ONLINE_PERMITS/ONLINE_PERMITS.HTML 2) FOR INSPECTION PURPOSES, PLEASE POST THE "AZPDES - POSTING REQUIREMENTS" GREEN SHEET AT CONSTRUCTION ENTRANCE OF THE SITE AT BEGINNING OF CONSTRUCTION ACTIVITIES AND MAINTAIN THIS POSTED DOCUMENT THROUGHOUT PROJECT CONSTRUCTION. 3) THIS GRADING PLAN AND SWPPP ARE FOR CLEARING, PAVING AND LANDSCAPING ASSOCIATED WITH THE SOUTH PARKING PROJECT AS SHOWN ON THE APPROVED GRADING PLAN (T07CM04647) SEALED BY GEOFF HARRIS DATED 6/11/08, AND GEOTECHNICAL REPORT AND ADDENDA FROM OLEG LYSYJ FROM TERRACON, AND DRAINAGE REPORT SEALED BY JUSTIN TURNER FROM ARROYO ENGINEERING AND ASSOCIATED ADDENDA DATED JUNE 30, 2008. 4) A COPY OF THE NOI, STORMWATER POLLUTION PREVENTION PLAN (SWPPP), GRADING PLAN AND GRADING PERMIT SHALL BE KEPT AT THE SITE AT ALL TIMES, UNTIL FINAL GRADING APPROVAL. 5) THIS PERMIT IS FOR THE SOUTH PARKING LOT IMPROVEMENTS ONLY. ADDITIONAL REVIEW / PERMITTING IS REQUIRED FOR THE NORTH PARKING AREA. 6) THERE SHALL BE NO ENCROACHMENT INTO THE ADJACENT AIRPORT WASH TRIBUTARY / RIPARIAN WASH. THERE SHALL BE NO DISTURBANCE OUTSIDE OF THE GRADING LIMITS AS SHOWN ON THE APPROVED PLANS FOR THE SOUTH PARKING LOT AREA. STOP WORK ORDER MAY BE ISSUED FOR DISTURBANCE OF WASH AREAS. 7) LOCATION OF TEMPORARY MATERIAL OR VEHICLE STAGING / STOCKPILE AREA SHALL BE PLACED WITHIN GRADING LIMITS AS DESIGNATED ON THE APPROVED PLANS, AND NOT PLACED WITHIN THE WASH AREA. 8) CONTACT PERMITS AND CODES (791-5100) FOR ANY QUESTIONS REGARDING ANY RIGHT-OF-WAY PERMIT REQUIREMENTS. 9) DUST CONTROL METHODS SUCH AS WATER TRUCK SHOULD BE PROVIDED, AS WELL AS DAILY SWEEPING OF THE STREETS. 10) NO GRADING SHALL BEGIN UNTIL ALL REQUIRED SWPPP CONTROLS ARE INSTALLED. 11) SEPARATE BUILDING PERMIT APPLICATIONS ARE REQUIRED FOR ANY WALLS. 12) ANY REVISION TO THE GRADING PLAN MAY REQUIRE A RE-SUBMITTAL OF A REVISED GRADING PLAN FOR REVIEW. CONTACT DSD ENGINEERING TO DISCUSS CHANGES IN GRADING DESIGN. 13) IF GRADING CONSTRUCTION IS EXPECTED TO LAST LONGER THAN THE EXPIRATION DATE OF THE GRADING PERMIT, CONTACT DSD TO RENEW/EXTEND THE GRADING PERMIT. IF FINAL GRADING INSPECTION HAS NOT BEEN COMPLETED BEFORE THE GRADING PERMIT EXPIRES, AND THE PERMIT HAS NOT BEEN RENEWED, ADDITIONAL FEES AND REVIEWS MAY BE REQUIRED. 14) PRIOR TO FINAL APPROVAL, AS-BUILT PLAN AND LETTERS OF COMPLETION ARE REQUIRED. 15) PRIOR TO REQUEST FOR FINAL INSPECTION APPROVAL, ANY OUTSTANDING FEES SHALL BE PAID. 16) THE PERMITEE SHALL NOTIFY DSD WHEN THE GRADING OPERATION IS READY FOR FINAL GRADING INSPECTION. FINAL GRADING APPROVAL SHALL NOT BE GIVEN UNTIL ALL WORK, INCLUDING INSTALLATION OF ALL DRAINAGE IMPROVEMENTS ALONG PERIMETER, UTILITY TRENCHES ARE BACKFILLED, CENTRAL PAVING, PERMANENT PROTECTIVE DEVICES, ALL EROSION CONTROL MEASURES HAVE BEEN COMPLETED, AND ALL CONDITIONS OF PERMIT ARE COMPLETED. 17) PRIOR TO REQUEST FOR FINAL GRADING INSPECTION APPROVAL, ALL PERMANENT EROSION CONTROL IMPROVEMENTS SHALL BE INSTALLED AND ACCEPTED BY DSD INCLUDING ROCK / ESTABLISHED REVEGETATION FOR ALL DISTURBED AREAS IF NOT IMPROVED AS PER APPROVED PLAN. If you have any questions, I can be reached at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/07/2008 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 07/07/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 07/07/2008 | DELMA ROBEY | REJECT SHELF | Completed |