Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T07BU02457
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/17/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | TO: RS Engineering SUBJECT: Country Club Industrial Grading Plan Engineering 2nd resubmittal Review LOCATION: 5994 S COUNTRY CLUB RD ACTIVITY NUMBER: T07BU02457, T08OT00756 SUMMARY: Engineering has received and reviewed the resubmittal package at an over the counter review. The package included: 3 copies of the revised grading plan, 3 copies of the revised SWPPP, 1 copy of Geotechnical report, 1 copy of (revised) drainage report/letter, Floodplain Permit application and fee, and response letter. The grading and floodplain use permits are approved and may be picked up after all review entities have approved both the Development Plan and the Grading Plan. The following conditions will apply to the grading permit. GRADING PERMIT CONDITIONS: The following 21 conditions apply to permit T07BU02457: 1) Call for Pre-construction meeting, intermediate and final inspections. For a DSD Engineering Inspection, call IVR (740-6970), or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) This Grading Plan and SWPPP are for grading construction associated with buildings 3 and 4 for the Country Club Industrial Development Plan D07-0034 including north parking area improvements as well as additional improvements within Lot 1 as shown on the approved Grading Plan T07BU02457. 3) Improvements to include new sidewalk area on west side of Building 1, re-striping of parking stalls on west side of Building 3, posting of one-way sign for west PAAL, paint stringing for non-accessible pedestrian refuge area along south side of Building 1 on lot 2, new bike racks, and new railing for handicap ramp at north west corner of Building 1 on lot 2. 4) For inspection purposes, please complete the "AZPDES - Posting Requirements" green sheet, and post at construction entrance of the site at beginning of construction activities and maintain this posted document throughout project construction. 5) A copy of the NOI, Stormwater Pollution Prevention Plan (SWPPP), Grading Plan and Grading Permit shall be kept at the site at all times, until final grading approval. 6) Signatures for the operators on Certification Statements must be on the site copy of the Stormwater Pollution Prevention Plan (SWPPP) at, or before, commencement of construction. 7) Temporary erosion/stormwater controls may be field adjusted with discussions with operators and engineer of record as necessary along disturbance limits for this project. 8) Designated concrete washout locations are required and shall not be located in or near the basin or water harvesting areas. Location of temporary material or vehicle staging / stockpile area shall be placed within grading limits and not located in any water harvesting or basin areas. 9) Dust control methods such as water truck will be provided, as well as daily sweeping of the streets. 10) Contact Permits and Codes (791-5100) for any questions regarding any right-of-way permit requirements. 11) The number and location of trees within existing and future sight visibility triangles may be restricted or modified by the City of Tucson in order to preserve visibility. 12) Any increase in flows at concentration point at Rodeo WASH entrance will require cleaning out of the vegetation at the spillway entrance. 13) Clear low growth in basin and repair any erosion along basin side slopes. Access to basin needs to be re-established during grading. Check and repair spillway entrance area to basin. 14) There shall be no disturbance outside of the approved disturbance/grading limits, and no grading shall begin until all required SWPPP controls are installed. 15) Separate building permit applications are required for any walls. 16) Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact DSD Engineering to discuss changes in grading design. 17) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 18) Prior to final approval, as-builts are required with the letters of completion for overall project. 19) Prior to request for final inspection approval, any outstanding fees shall be paid. 20) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements, including any scuppers, and their permanent protective devices, and all erosion control measures have been completed, and all conditions of permit are completed. 21) Prior to request for final grading inspection approval, all permanent erosion control improvements shall be installed and accepted by DSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. Please call me for clarifications at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 04/21/2008 | SREEVES1 | ZONING | REVIEW | Needs Review | |
| 04/21/2008 | SREEVES1 | NPPO | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/21/2008 | SUE REEVES | OUT TO CUSTOMER | Completed |