Permit Number: T07BU02307
Parcel: 13109179A

Review Status: Completed

Review Details: GRADING

Permit Number - T07BU02307
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/15/2008 PAUL MACHADO ENGINEERING REVIEW Denied To: Stephen Robinson DATE: January 17, 2008
Architect
8115 E. Cloud Road
Tucson, Arizona 85750
SUBJECT: New Apartments, 1529 S. Jefferson Ave
Grading Plan T07BU02307 (First Review)
T14S, R14E, Section 24

RESUBMITTAL REQUIRED: Grading Plan, Drainage Statement.

The Grading Plan (GP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading Plan:
1. Please include a response letter to the comments along with the corrected copies of the GP.
2. The GP cannot be approved prior the approval of the Site Plan.
3. As per the Federal ADA requirements, all wheel chair ramps shall have the truncated domes instead of the standard grooves that are shown on COT SD 207. Aside from the Truncated Domes, all wheel chair ramps shall be constructed in accordance with COT SD 207.
4. Revise grading note no. 6 to read that the grading shall conform to City of Tucson Development Standard Chapter 11, Excavation and Grading.
5. Add the following notes to the grading plan:

· "The approved Grading Plan is the only acceptable construction plan onsite. The Contractor may not use any other plans, such as the approved Tentative Plat and/or Development Plan, for construction purposes. The Contractor may ask the Development Services Inspector to consult with the other approved plans for additional information or details that might not be included on the approved grading plan but needed for completion of work."

· "Any engineering work to be done below grade (i.e. toe-downs, cutoff walls, drainage pipes/structures, etc.) shall not be back filled until Development Services Inspector inspects the work and approves it."

6. Add note: "Depress all landscaped areas a maximum of 6" for water harvesting"
7. Provide considerably more proposed spot elevations on the GP. It appears that the site would be difficult for a contractor to properly grade with the sparse amount of proposed elevations provided.
8. List grading plan number (T07BU02307) on the plans.
9. Show Phase numbers and delineate. Each phase must function independent of future phases.
10. Show cross section of PAAL's with transverse and longitudinal slopes.
11. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, add a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed.
12. Call out surface paving material.
13. Curb and Gutter elevation include drainage flow with percent slope.
14. Show details of all surface materials.
15. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
16. Slopes of 3H: 1V require hand placed riprap.
17. Slopes of 2H: 1V or greater require grouted riprap.
18. Cut or fill slopes require a 2' minimum setback from property line.
19. Drainage patterns with percent slopes (Show patterns within the first 100 feet from the property line).
20. Flow arrows, grades and flow rates within and adjacent to site to show drainage scheme.
21. Call out peak discharges entering and exiting the site.
22. Contact Environmental Services @ 791-5543 x1212, Andy Vera, for approval of curbside pickup and/or for refuse enclosure questions. Show details of the refuse enclosure on the plans.
23. No grading is allowed on adjacent properties with the proper documentation supplied by the applicant.
24. Employ the use and show on the drawing of how the stormwater will be directed to the use of the 6" water harvesting areas.

Drainage Statement:
1. Please include a response letter to the comments along with the corrected copies of the DS.
2. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the site plan and accepted with the approval of the grading plan.
3. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2.
4. Show the project address or administration address and the GP number on the cover sheet of the DS.

If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:\1529 S. Jefferson Ave grad
11/21/2007 TERRY STEVENS ZONING REVIEW Denied 11/26/07

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.
11/23/2007 ANDREW CONNOR NPPO REVIEW Denied Site plan approval is necessary to continue review.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/23/2008 CINDY AGUILAR OUT TO CUSTOMER Completed
01/23/2008 SUE REEVES REJECT SHELF Completed