Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T07BU02272
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/07/2007 | DAVID RIVERA | ZONING | REVIEW | Denied | 11/07/07 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan on this review. 2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the CDRC approved and stamped development, landscape, and NPPO plans with the next grading plan submittal. 3. Please ensure that the grading plan matches the CDRC approved and stamped development plan. 4. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved development plan. Additional comments may be forthcoming. |
| 11/08/2007 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit a copy of the approved development plan including landscape and native plant preservation plans for reference. The grading application will be reviewed for compliance only when the approved documents are included in the submittal. Revise grading plans as necessary to comply with the approved plans. |
| 12/18/2007 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: December 19, 2007 SUBJECT: 8272 S Camino De Cafe Grading Plan- 1st Engineering Review TO: Jeffrey A Stanley, P.E. LOCATION: T15S R15E Sec17 Ward 4 REVIEWERS: Jason Green, CFM ACTIVITY: T07BU02272 (Grading Plan) SUMMARY: Engineering Division of Development Services Department has received and reviewed the grading plan (T07BU02272) and Drainage Statement (Stanley Engineering & Drainage, Inc., 09OCT07) for the above referenced property. Engineering Division does not recommend approval of the grading plan at this time. The following items need to be addressed: GRADING PLAN COMMENTS: The project was reviewed for grading purposes, however until the last stamped approved Development Plan is submitted the grading plan could not be shown to be in conformance with the approved plan. Further comments may be forth coming depending on the submitted Development Plan. 1) Provide a copy of the last approved Development Plan (D07-0027). The grading plan will not be approved until verification that all details, locations, dimensions, and plan profiles match the approved Development Plan. Provide all information associated with the Development Plan and the additional information that is required on the grading plan that will be used as the construction document. 2) The correct grading plan number (T07BU02272) must be added to the lower right hand corner of the plans where indicated by "T07BUXXX." 3) Provide the Development Plan Reference (D07-0027) in the lower right hand corner of the plans adjacent to the grading plan number. 4) DS Sec.11-01.4.1.3: Revise the grading plan to provide the square footage of the entire lot, the square footage of the proposed disturbed area, and clearly label the limits of grading on Sheet 2. 5) DS Sec.11-01.4.1.4: Revise the grading plan to show the downspout locations at the sidewalk around the 2 sides of the building. Any scuppers proposed under the sidewalk will be designed and constructed to convey the 10-year flood flow. 6) Provide a general note on the grading plan to state the following: "Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html GENERAL COMMENTS: Please provide an approved Development Plan and a revised grading plan that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Enclose "redlines" with the resubmittal package. Further comments may be generated upon resubmittal of the grading plan review. If you have any questions, or to schedule an appointment, I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/24/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 12/24/2007 | SHANAE POWELL | REJECT SHELF | Completed |