Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07BU01927
Parcel: 13325183B

Review Status: Completed

Review Details: GRADING

Permit Number - T07BU01927
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/14/2007 PATRICIA GILBERT ENGINEERING REVIEW Denied DATE: September 17, 2007
ACTIVITY NUMBER: T07BU01927
PROJECT NAME: Saguaro Shops
PROJECT ADDRESS: 8650 East Speedway Blvd.
PROJECT REVIEWER: Patricia Gilbert

The following items must be revised or added to the grading plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: GRADING PLAN


1. A copy of the stamped approved Site Plan must be included with the Grading Plan submittal.

2. Provide the grading plan activity number on each sheet in the lower right hand corner.

3. Provide sight visibility triangles in the required locations.

4. Show roof drainage (flow arrows). DS 2-02.2.1.A.16.

5. Show the grading limits on the plan. See the Development Standard 11-01.9. for the required setbacks.

6. Add a general note; Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html

7. Please note that subsequent comments may be necessary upon resubmittal, depending on the nature and extent of revisions that occur to the plans.

DRAINAGE REPORT COMMENTS

1. In the narrative indicate the datum used for the water surface elevations (WSE), either NGVD 1929 or NAVD 1988. In the response letter indicate what page this information can be found. SMDDFM 2.3.1.4.C. This comment is from the site plan review and has not been addressed. The response to this comment was the datum was added to section 3 of the drainage report. This information was not provided. Provide the requested information in the drainage report, highlight the area in the report and in the response letter indicate where the datum can be found.

2. Correlate the cross-sections provided on the existing and proposed drainage map to the pre and post HEC-RAS spreadsheets and the pre and post profiles.
09/26/2007 SREEVES1 ZONING REVIEW Needs Review
09/26/2007 SREEVES1 NPPO REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
09/26/2007 SUE REEVES OUT TO CUSTOMER Completed