Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T07BU01865
Parcel: 12417229A

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T07BU01865
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/25/2008 ANDREW CONNOR NPPO REVIEW Approved
04/10/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: April 11, 2008
SUBJECT: Grading Plan for M&B Mechanical
TO: Southwestern Consulting Engineering, Attention: Steve Wollerman,
LOCATION: 1101 S Santa Rita Avenue
REVIEWER: Bianca Ramirez, CFM
ACTIVITY NUMBER: T07BU01865 (Second Review)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed grading plan (1st Review) for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. The following items must be revised or added to the grading plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: GRADING PLAN


1. Please include a response letter to the comments along with the corrected copies of the Grading Permit.

2. Complied

3. The Development Plan is currently in review. Any changes made to the Development Plan must be reflected on the Grading Plan. The Development Plan and Grading Plan must match.

4. Complied

5. Complied

6. Complied

7. Complied


8. Complied

9. The soils engineering report required by the International Building Code 1802.6 (IBC) shall include data regarding the nature, distribution and strength of existing soils, conclusions and recommendations for grading procedures and design criteria for corrective measures, including buttress fills, when necessary, and opinion on adequacy for the intended use of sites to be developed by the proposed grading as affected by soils engineering factors, including the stability of slopes. Provide soils report for verification of setback from building to beginning slope of water harvesting area. Provide dimension for from building to top of water harvesting area. Water Harvesting areas that are less than 10' from a building require that a soil report be submitted for recommended setback.

10. A permit or a private improvement agreement will be necessary for any work performed in the right-of-way. Contact (520) 791-5100 for permit information.

Complied

11. Complied

12. At northwest corner of parcel truncated domes are present. These truncated domes are not needed in this location. Please remove. Looking north going east there is a stripped 4' pedestrian walkway. 4' sidewalk required. In addition, barriers need to be located between sidewalk and PAAL with either wheel barriers or curb. Looking north going west there is a landscape area with no warning address by adding curb or explain.

13. Complied

14. Complied

15. Per detail (E) existing proposed location of truncated domes not required because transition is onto sidewalk. Truncated dome required from parking area to sidewalk. See detail (E) on grading plan G1.3 for redlines.

16. At northeast corner of building, proposed sidewalk shows ramp and truncated domes. Installation of sidewalk may require relocation of ramp and truncated domes. Comments may be forthcoming.

17. Complied

18. Provide accessible stripped crosswalk across PAAL for pedestrian access to trash enclosure.

19. Complied

20. Complied

21. Revise Detail H to show R=42' and R = 27.8' per ASHTO - Geometric Design of Highways and Streets - Figure II-2. Minimum turning path for SU design vehicles. Modify radius located within the eastern portion of detail.

22. Complied

23. Complied

24. Complied

25. Complied

26. Complied

27. Add a general note; Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html

28. Extend detail N to include right of way, indicate slope on detail.

29. Provide specifications for filter fabric being called out in rip rap detail on sheet 2.

30. Please note that subsequent comments may be necessary upon resubmittal, depending on the nature and extent of revisions that occur to the plans.

Bianca C. Ramirez, CFM
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
C:/8178 E. 22nd St. Site
04/14/2008 MICHAEL ST. PAUL ZONING REVIEW Denied April 14, 2008

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T07BU01865 Grading Plans for D07-0016
1101 South Santa Rita Avenue

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and until all zoning comments or concerns have been addressed.

2. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/18/2008 DELMA ROBEY OUT TO CUSTOMER Completed
04/18/2008 SHANAE POWELL REJECT SHELF Completed