Permit Number: T07BU01719
Parcel: 14041129A

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T07BU01719
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/17/2008 JASON GREEN ENGINEERING REVIEW Approved DATE: January 17, 2008
SUBJECT: 7000 S Palo Verde Road Grading Plan- 3rd Engineering Review
TO: Rick Engineering Company
LOCATION: T15S R14E Sec16 Ward 5
REVIEWERS: Jason Green, CFM
ACTIVITY: T07BU01719 (Grading Plan)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised grading plan (T07BU01719), Drainage Report (Rick Engineering Company, 08OCT07), Geotechnical Report (Terracon, 12JUN07) and Stormwater Pollution Prevention Plan (Rick Engineering Company, 13NOV07, revised 21DEC07) for the above referenced property. Engineering Division recommends approval of the grading plan application at this time.

1. "Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html

2. Approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction. Contact Thad Harvison, (520)-791-5100 or Thad.Harvison@tucsonaz.gov for all right-of-way requirements and permit applications.

3. It is acknowledge that the stockpile will be hydro-seeded per the grading plan. Due to the amount of fill proposed to be stockpiled a bond will be posted for native seeding. If grading construction does not commence within 60 days after grubbing, the disturbed area shall be native seeded within 30 days following the expiration of the 60 day period. (Second time comment has been posted)
a) Acceptable temporary controls during grading construction and up to the 60 +30 day period of non-activity:
- interim erosion and sediment controls as indicated by standard accepted BMP's
- spray-ons
- unestablished vegetation
- water truck for dust abatement
- daily sweeping of the streets

b) For stockpiles that expect to last longer than a couple of months, the accepted permanent erosion protection shall be in the form of:
- established revegetation
- gravel or rock


For any questions or to schedule a meeting, call me at 837-4929.




Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
01/24/2008 ANDREW CONNOR NPPO REVIEW Approv-Cond
01/25/2008 HEATHER THRALL ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
06/05/2008 SUE REEVES APPROVAL SHELF Completed
06/05/2008 CPIERCE1 OUT TO CUSTOMER Completed