Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T07BU01689
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/22/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | August 22, 2007 Development Services Department Zoning Review Section Michael St.Paul Planning Technician T07BU01689 Grading Plans for S06-125 Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved tentative plat. Please submit one copy of the CDRC approved and stamped tentative plat, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped tentative plat. Additional comments may be forthcoming. |
| 08/24/2007 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit a copy of the approved tentative plat including landscape and native plant preservation plans for reference. The grading application will be reviewed for compliance only when the approved documents are included in the submittal. Revise grading plans as necessary to comply with the approved tentative plat. |
| 10/22/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: October 22, 2007 To: Merwin Yellowhair Ameribuilt Development Inc 5255 E Williams Circle Suite 6000 West FROM: Loren Makus Engineering Division SUBJECT: Rincon Knolls Phase 3 Grading Plan T07BU01689(First Review) T16S, R16E, Section 04 RESUBMITTAL REQUIRED: Grading Plan, and SWPPP The Grading Plan (GP), and Stormwater Pollution Prevention Plan cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan Comments: Some of the comments from the review of the first phase grading plan are included here. These comments are of a general nature and should be addressed as applicable to this phase. 1. Please include a response letter to the comments along with the corrected copies of the GP. 2. As per the Federal ADA requirements, all wheel chair ramps shall have the truncated domes instead of the standard grooves that are shown on COT SD 207. Aside from the Truncated Domes, all wheel chair ramps shall be constructed in accordance with COT SD 207. Include the addition of truncated domes to each mention of the standard detail. 3. Add dimensions for sidewalk widths either on the plan view or in the keynote. 4. Provide standard detail reference for vertical curb and gutter key note. 5. For detail 11 on sheet 7, revise the detail to address the ADA requirement for a 48 inch landing at the top of the curb access ramp or show that the flared sides will have slopes less than 1:12. Also explain the vertical curb called out at the back of the sidewalk. 6. Provide dimensions for the headwall described in note 512 as illustrated in the standard details. 7. Revise all of the type in the plan that is less than 12 point. The 12 point minimum is required for all plans that must be microfilmed so the print remains legible. 8. Please check the use of asterisks to mark the key notes that are not used on each sheet. 9. Clearly label areas that are to be left undisturbed and areas that are to be revegetated. 10. Show how lot grades will be transitioned to adjacent lots and roadways, especially where there are substantial grade changes. (For example, lot 31 is about 4 feet above the adjacent roadway.) 11. Fill slopes shall not be steeper than 2:1 and cut slopes steeper than 2:1 must be supported by a geotechnical engineers report. Revise the plan whereever such slopes are proposed. Revise the detail callouts for the temporary fire lanes on sheet 4 to refer to the correct detail. 12. Provide retaining wall specifications for all retaining walls proposed. Revise keynote 100 accordingly. 13. Add the following notes to the grading plan notes: · "The approved Grading Plan is the only acceptable construction plan onsite. The Contractor may not use any other plans, such as the approved Tentative Plat and/or Development Plan, for construction purposes. The Contractor may ask the Development Services Inspector to consult with the other approved plans for additional information or details that might not be included on the approved grading plan but needed for completion of work." · "Any engineering work to be done below grade (i.e. toe-downs, cutoff walls, drainage pipes/structures, etc.) shall not be back filled until Development Services Inspector inspects the work and approves it." 14. Describe drainage openings in the wall a at all locations where the drainage is directed toward a wall. Include a description of the frequency of the openings and clarify that the openings will be provided at each level of the wall. 15. Indicate that all walls will be constructed under a separate permit. 16. Revise the areas of the plan, such as the rip rap channels, where the symbols and text overlap, causing the text to be unreadable. Either provide complete information in details or provide the construction in formation in some other readable form. 17. Make sure that all call outs or detail references have corresponding details. Also revise the callouts as necessary to refer to the correct description or to the correct detail. 18. Confirm that the existing contours are correctly labeled on all sheets. 19. At least two general notes on sheet 2 refers to non-existing or incorrect details. Provide correct references for this and all callouts. 20. Provide culvert length, slope and inverts for all street crossings. 21. Show the limits for each proposed guard rail, rock barrier wall and handrail. Indicate the total length of each feature wherever used. 22. Clarify how driveways will function in relation to the curb transitions at all corner lots that are affected. 23. Clarify the use of "native" in the description of the rip rap proposed throughout the site. 24. Provide specific details for the channels and swales proposed through the site showing how the grades adjacent to the channels and the other data work together. For Example, detail 16/10 shows a maximum side slope of 5:1. The flow line grade and the grades adjacent to the channel appear to indicate that the channel will need to be much wider than depicted on the plan view. 25. Clarify the material used for the floor of the wildlife crossing box culverts. Include this symbol and all other 26. The detail callout for 18/7 on sheet 3 doesn't seem to refer to the correct detail. Provide the correct detail. 27. On this plan and the plans for all phases of this project, provide details for all wash crossings. Indicate the areas that are to be undisturbed in each of the details. 28. Provide details, dimensions or otherwise indicate the extent of rip rap and slope areas such as described by notes 105-107 and 502-505 to clarify the extent indicated. Generally scaling from the plan is not acceptable. Stormwater pollution prevention plan Comments: These comments are the same as for the Phase 1 review. Additional review comments may be forthcoming once the completed checklist is provided. 29. Revise the silt fence detail to remove the mounded soil around the base of the silt fence. The backfilled soil should be compacted to the level of the natural grade. 30. Part IV.B.2.c Explicitly indicate in the SWPPP the name of the operator with operational control over project specifications (including the ability to make modifications in specifications). 31. Part IV.B.2.c Explicitly indicate in the SWPPP the name of the operator with operational control over day-to-day activities at the construction site. 32. Part IV.C.3.c. Identify on the map locations of structural and nonstructural controls identified in the SWPPP. 33. Part IV.C.4. Identify on the map or in a narrative, the nearest receiving water(s), including ephemeral and intermittent streams, dry sloughs, arroyos. 34. Part IV.D.1. For each major activity, describe the BMP, the general sequence for implementing BMPs, and which operator is responsible for each BMP. 35. Part IV.D.2.c. Describe the practice and schedule to routinely remove offsite accumulation of sediment 36. Part IV.D.3. Describe good housekeeping procedures to be used (prevent litter, debris and chemicals from being exposed to stormwater) 37. Part IV.D.4.a. Describe and identify interim and permanent stabilization practices for the site. Document where existing vegetation will be preserved 38. Part IV.D.4.b. Describe when the operator will initiate stabilization procedures in the timeframe provided in the permit, and what stabilization efforts will occur 39. Part IV.D.5. Describe structural practices used to divert flows from exposed soils, store flows and limit runoff and the discharge of pollutants from exposed areas to degree attainable. (Combination of sediment and erosion controls must be used) 40. For a drainage area of equal to or greater than 10 disturbed acres, describe how and where a basin with storage for a 2yr, 24hr storm per disturbed acre drained will be used OR 41. Describe how and where a basin with 3600 ft3 of storage per disturbed acre drained will be used OR 42. If a sediment basin is not attainable, then provide explanation within SWPPP 43. Part IV.D.8.c. Describe BMPs for managing concrete truck washout and surplus concrete discharge. 44. Part IV.D.5.b Describe where and what type of velocity dissipation devices will be used at discharge locations and along outfall channel 45. Part IV.D.6. Describe post-construction stormwater management measures 46. Sincet there are so many comments on the SWPPP, please include a copy of the SWPPP checklist provided by ADEQ. Include notations indicating where each required item appears in the SWPPP. The checklist can be obtianed at http://www.azdeq.gov/environ/water/permits/download/cswppp.pdf . If you have any questions, I can be reached at 520.837.4927 or loren.makus@tucsonaz.gov. Loren Makus, E.I.T. Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 520.837.4927 office 520.879.8010 fax |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/23/2007 | THAUSER1 | OUT TO CUSTOMER | Completed |
| 10/23/2007 | THAUSER1 | REJECT SHELF | Completed |