Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T07BU01547
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2008 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit copies of the approved Overlay Zone and Site plans (Case #'s T06SA00248 & T07CM02975 ) for reference. The application will be reviewed for compliance when the approved documents are included in the submittal. Additional comments may apply upon subsequent reviews. |
| 02/01/2008 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | February 1, 2008 Development Services Department Zoning Review Section Michael St.Paul Planning Technician T07BU01547 Grading Plans for T07CM02975 & HDZ Overlay T06SA00248 3007 West Via De Suenos Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. In addition, The site plan (T07CM02975) and the overlay plan (T06SA00248) have not been approved. We cannot verify that the grading plan is in compliance with a site plan for this site. Please submit two copies of the approved and stamped Site Plan, HDZ Overlay Plan, Landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming. 4. All these plans should be submitted together. |
| 02/11/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approv-Cond | SUBJECT: 3007 W Via De Suenos HDZ Engineering Review REVIEWER: Elizabeth Eberbach ACTIVITY NUMBER: T06SA00248, T06CM02975, T07BU01547 SUMMARY: The revised residential overlay and site/grading plans were received and reviewed by Engineering. The Overlay package was submitted and reviewed with the revised site/grading plans. Accuracy of data appears to be within a reasonable tolerance; ACS calculation for this parcel is accepted. Engineering recommends approval of the Overlay review, and recommends conditional approval of the site / grading plan review. SITE/GRADING PLAN CONDITIONS OF APPROVAL: 1) LUC Sec.2.8.1.6.A: Per response letter, geotechnical report was submitted, yet none was provided in package. Submit geotechnical letter/report to address the following: a) Assure proposed slope surface treatments for cut and fill slopes match geotechnical report. b) Provide a geotechnical report that provides minimum slope recommendations for the site. c) DS Sec.11-01.10.5: Condition of grading will be that the slope in the interceptor swale is no steeper than 3:1(H:V), with minimum of 30-in bottom width, if no geotechnical engineering letter is submitted. 2) Provide estimated cut/fill quantities for permitting purposes. Submittal of geotechnical Report is required to address the above items. Submit 3 copies of the revised site / grading plan if needed to address comments. For questions or to set up a meeting, call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |