Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T07BU00290
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/17/2007 | MATT FLICK | ENGINEERING | REVIEW | Denied | Please note that the plans are confusing to review. Some items that are not shown on the Phase 1 plan appear on the Phase 2 plan (this is being submitted under 1 "BU" number and, so, is being considered as one development) and some items shown on the grading plan do not appear on the site plan. Phase 1 Plan: 1. Provide a sidewalk along the site perimeter where none exist today. Minimum size along Anaconda Way is 5' and minimum size along Kolb Road is 6'. Please note that construction in the public right-of-way will require a right-of-way construction permit from TDOT. 2. Provide ADA-compliant ramps where sidewalks are to cross driveways or streets. 3. Provide horizontal dimensioning for the basin at the south end of the eastern parking area. 4. Please correct the overwrite located near the survey monument at the intersection of Anaconda Way and Kolb Road. Phase 2 Plan: A. Install 5' sidewalk along Anaconda Way where none is currently indicated. B. Install ADA-compliant ramps where sidewalks are to cross driveways. C. 6' is the minimum sidewalk width along Major Streets (Kolb Road) per Mayor & Council policy. D. 2 "A" sections are shown on Sheet C1.2A. Drainage Report: The report is not approved. The following comments are offered: Page 3 - The responsible party named on this page and in Appendix G do not agree. Page 5 - The infiltration rates could not be found in Appendix G. SWPPP: The response from the consultant indicates a SWPPP was submitted. None appeared in the package that this reviewer had possession of. Please submit a SWPPP with the next submittal. |
05/29/2007 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: MER Corporation Expansion T07BU00290 Grading Plan (2nd Review) TRANSMITTAL DATE: May 29, 2007 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\grading\t07bu00290 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plans and additional requested documents |
06/04/2007 | ANDREW CONNOR | NPPO | REVIEW | Denied | Site plan approval is necessary to continue review. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/06/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
06/06/2007 | SUE REEVES | REJECT SHELF | Completed |