Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: PLANS OK TO SUBMIT - GRADING
Permit Number - T07BU00030
Review Name: PLANS OK TO SUBMIT - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2007 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
01/04/2007 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: January 4, 2007 TO: Hector Rubio SUBJECT: 2093 S Twinkling Starr Grading Review REVIEWER: Elizabeth Eberbach ACTIVITY NUMBERS: T06CM06294, T07BU00030 Summary: Engineering Division has reviewed the grading/site plan at the counter with Owner/Builder and recommends approval. The following 8 conditions apply to grading permit T07BU00030: GRADING PERMIT CONDITIONS: 1) CALL FOR PRE-CONSTRUCTION MEETING. FOR A DSD ENGINEERING INSPECTION, CALL IVR (740-6970), OR SCHEDULE WITH A CUSTOMER SERVICE REPRESENTATIVE AT THE DEVELOPMENT SERVICES DEPARTMENT, OR CONTACT DSD ENGINEERING AT 791-5550 EXTENSION 2101, OR SCHEDULE INSPECTIONS ONLINE AT: HTTP://WWW.CI.TUCSON.AZ.US/DSD/ONLINE_SERVICES/ONLINE_PERMITS/ONLINE_PERMITS.HTML 2) A COPY OF THE GRADING PLAN AND GRADING PERMIT SHALL BE KEPT AT THE SITE AT ALL TIMES, UNTIL FINAL GRADING APPROVAL. 3) ANY REVISION TO THE GRADING PLAN MAY REQUIRE A RE-SUBMITTAL OF A REVISED GRADING PLAN FOR REVIEW. CONTACT DSD ENGINEERING AT 791-5550 TO DISCUSS CHANGES IN GRADING DESIGN. 4) IF GRADING CONSTRUCTION IS EXPECTED TO LAST LONGER THAN THE EXPIRATION DATE OF THE GRADING PERMIT, CONTACT DSD TO RENEW/EXTEND THE GRADING PERMIT. IF FINAL GRADING INSPECTION HAS NOT BEEN COMPLETED BEFORE THE GRADING PERMIT EXPIRES, AND THE PERMIT HAS NOT BEEN RENEWED, ADDITIONAL FEES AND REVIEWS MAY BE REQUIRED. 5) SEPARATE BUILDING PERMIT APPLICATIONS ARE REQUIRED FOR ANY WALLS. 6) NORTH SLOPE PROTECTION: GROUTED RIPRAP SHALL BE EXTENDED TO GARAGE. 7) THE PERMITEE SHALL NOTIFY THE DSD WHEN THE GRADING OPERATION IS READY FOR FINAL GRADING INSPECTION. FINAL GRADING APPROVAL SHALL NOT BE GIVEN UNTIL ALL WORK, INCLUDING INSTALLATION OF ALL DRAINAGE IMPROVEMENTS AND THEIR PERMANENT PROTECTIVE DEVICES, AND ALL EROSION CONTROL MEASURES HAVE BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED GRADING PLAN AND GRADING PERMIT, AND ALL CONDITIONS OF PERMIT ARE COMPLETED. 8) THERE SHALL BE NO DISTURBANCE OUTSIDE OF THE DISTURBANCE/GRADING LIMITS. I can be reached at 791-5550, ext.2204 if you have questions. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services Department |