Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T07BU00008
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/19/2007 | KAROL ARAGONEZ | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Karol Aragonez Planner PROJECT: T07BU00008 7150 East 22nd Street Grading TRANSMITTAL DATE: January 4, 2007 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550. S:\zoning review\planning\site review\T07BU00008.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plan, grading plan and additional requested documents |
04/20/2007 | MATT FLICK | ENGINEERING | REVIEW | Denied | Please note that several comments from the 1st review still apply to this submittal: GRADING PLAN: DSD Engineering Comments for Desert Toyota 2nd Submittal DSD Engineering Offers The Following Comments: 1. The Project Activity Number is T07BU00008 (grading). 2. Page 6 - Portions of the storm drain within the public drainage easement shall be of material acceptable to the City Engineer. Steel or corrugated metal pipe is not an acceptable material. 3. Page 7 - Portions of the storm drain within the public drainage easement shall be of material acceptable to the City Engineer. Steel or corrugated metal pipe is not an acceptable material. A Floodplain Use Permit application ($50 for application, + $150 for drainage report) is necessary. The grading permit will not be issued prior to approval of the floodplain permit. Please note that the site lies within a City of Tucson flood hazard area as shown on mapping available at the DSD Engineering counter. A Floodplain Use Permit application ($50 for application, + $150 for drainage report) is necessary. The grading permit will not be issued prior to approval of the floodplain permit. |
04/27/2007 | JOE LINVILLE | NPPO | REVIEW | Denied | 1) Revise the grading plan in conformance with the site/landscape plans. Review of grading plans will proceed when the site plan package is approved. Show water harvesting areas, finished grades for screening locations and adjacent areas on the development side of the screen. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/16/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
05/16/2007 | CINDY AGUILAR | REJECT SHELF | Completed |