Plan Number: T06PI00065
Parcel: Unknown

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00065
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/02/2007 ASHOFFS1 UTILITY CLEARANCES COT STREETS DIVISION Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES QUEST COMMUNICATION Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES COX COMMUNICATION Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/02/2007 ASHOFFS1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed Please submit Utility Clearance Letter from Tucson Water and Pima County Wastewater.
07/12/2007 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond July 12, 2007
ACTIVITY NUMBER: T06PI00065
PROJECT NAME: TSN Mountain Kingdom Hall
PROJECT ADDRESS: 4729 N Silverbell Rd
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering recommends a conditional approval of the PIA Plan. Therefore address the attached comments reflected on the red-lines provided (located on Sheet 3 of 3). Modifications to the plans shall be reflected on the Mylars.

If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
07/24/2007 GARY WITTWER DOT LANDSCAPE REVIEW Approved NPPO not addressed. No plan submitted.
07/25/2007 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed these plans and have the following comments:

1. Sheet 2 - It is assumed that the concrete header called out at the returns will be at least from the BCR to the ECR.
2. There will be no landscaping added or moved in the right of way that will be the City's to maintain.
07/25/2007 Blanca Espino DOT ENGINEERING REVIEW Approv-Cond PIA Plan
1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word sentences are unacceptable. Include plans/redlines from previous plan submittal.

2. Sheet 1, remove and relocate the PIA # T06PI00065 from the Plan title/heading to just above the Title box. See redlines. Correct and revise.

3. Sheet 1, Title Block; Correct as per redlines.

4. Sheet 2, shows a retention area to accept the street discharge. This was not proposed on the approved development plan. Correct and revise to reflect approved development plan.

5. Sheet 2, Deceleration lane's vertical curbing can be removed and replaced with thickened edge to accept the street runoff. Concrete headers are preferred along asphalt radius returns when arterial and collectors streets are without curbs.

6. Sheet 2, Indicate a dimensioned cross section detail for cut-off wall.

7. Sheet 2, Indicate Stationing, Offset and Elevation every 50-feet for Pavement Edge in plan view.

8. Sheet 2, Indicate Stationing, Offset and Elevation every 50-feet for Saw-cut, Trim, Tack & Join in plan view.

9. Sheet 2, Profile, Indicate the proper Slope direction between Sta. 13+87 & 14+24. Correct and revise.

10. Projects adjoining other jurisdictions must have proposed improvements approved by affective jurisdiction. City of Tucson Development Services is required to review, comment and approve the proposed development plan. A Floodplain Use Permit is required from COT/DSD due to this area is private development and in a FEMA Floodplain Zone A. Submit FUP issued by Pima County for review. Correct and revise.

11. Sheet 1, Detail A; Pedestrian areas/shoulders along side of strip paved streets should be a minimum of 8 feet wide, slope @ 2% and be separate to drainage ditches/channels. Correct and revise.

12. See redlines for additional corrections.

13. Mylar can be submitted once the above comments have been addressed and looked at for acceptance.

If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov
07/26/2007 LHENDRI1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
07/26/2007 LHENDRI1 PIA COORDINATOR OUT TO CUSTOMER Completed