Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T06PI00063
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/17/2007 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | 1. Approved Development Plan required for review. 2. Submit copy of the approved Geotechnical Report that recommends Pavement Section Design. |
02/27/2007 | ASHOFFS1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
02/27/2007 | ASHOFFS1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/14/2006 | ASHOFFS1 | ENGINEERING | REVIEW | Passed | |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Submit Utility Clearance Letters |
12/14/2006 | ASHOFFS1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Submit Utility Clearance Letters |
12/15/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | Only drought tolerant plant materials are allowed within the ROW. This up grade requires the removal of grass within the newly dedicated ROW. Please note grass to be removed within ROW where new ROW is requested and provide notes on new landscaping. |
12/19/2006 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | December 18, 2006 ACTIVITY NUMBER: T06PI00063 PROJECT NAME: The Pavillions PROJECT ADDRESS: 5151 E Broadway Blvd PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. The symbol used for new street signs is not used in accordance with Standard Details for Public Improvements, SD100, 2003 edition. Please add to legend. 3. Place the PIA and CDRC Case number on the cover sheet. 4. Provide a 'RIGHT LANE' (R3-5F) supplemental plaque under the new (R3-5R) along Broadway Blvd. 5. Sheet 3: Callout 25' radius returns at driveway entrance. 6. The proposed right turn lane should be designed per the PCDOT & TDOT Pavement Marking Design Manual section 4-7 and the PCDOT & TDOT Signing Manual (2002) Chap 9-5D. 7. See redlines on the submitted drawings (sheet 1-3) and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 8. Add the following Pavement Marking/Striping General Notes to the Plans: 'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.' 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov |
12/27/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed this plan and have the following comments: 1. Plans shows 4 foot wide sidewalk. Typically, we require 5 foot sidewalks on arterials. 2. Will any existing landscaping need to be relocated with this project? 3. Will there be any new landscaping with this project? 4. All work in the City right of way needs to be coordinated with Paul Rosenboom at 791-3154, ext 234 to prevent damage to existing landscaping and irrigation. No further comments. 12/27/06 |