Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T06PI00062
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T06PI00062
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2007 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed these plans and have the following comments:

1. Please provide a Streets and Traffic Maintnenace Signature block.
2. Will any existing landscaping need to be relocated as part of this project?
3. Will any new landscaping be added with this project?
4. All work in the City right of way needs to be coordinated with Paul Rosenboom at 791-3154 ext 234, to prevent damage to existing landscaping and irrigation.

No further comments. 1/3/07
01/12/2007 Blanca Espino DOT ENGINEERING REVIEW Denied PIA Plan
1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word sentences are unacceptable. Include plans/redlines from previous plan submittal.

2. Attached is a copy of the required Title Block to be used on PIA Plans. Correct and revise.

3. Indicate the assigned I-Plan Number "I-2006-092" to all sheets.

4. Submit a copy of the approved Geotechnical Report.A Geotechnical Report is required for submittals and must include pavement section and reference soil recommendation for public roads.

5. Submit a copy of the approved PAD-11, Ordinance No. 10197 referencing all right-of-way issues to this project.

6. Indicate the Administrative address for project.

7. Indicate Developer and Owner's name.

8. Add note to General Construction Notes: All concrete shall conform to PC/COT SSPI Section 1006, Class S, 3,000 PSI compressive strength at 28 days, unless otherwise specified.

9. Add note to General Construction Notes: All changes to these plans must be cleared by the City of Tucson City Engineer's Permits and Codes Section, prior to construction.

10. Add note to General Construction Notes: The City shall not be held liable for any errors and/or omissions on these plans. Items not meeting City Standards shall be repaired/replaced at no cost to the City.

11. Add note to General Construction Notes: The Engineer of Record shall submit to the City for acceptance any changes to the approved plans prior to construction. Additionally, the Engineer of Record shall certify all changes meeting all applicable standards, codes, and ordinances.

12. Add note to General Construction Notes: A Soils Engineer shall conduct Quality Control material and inspection testing in accordance to City Standards and Specifications at no cost to the City.

13. Add note to General Construction Notes: An excavation permit shall be obtained from the City of Tucson Transportation Department prior to any work within the Public right-of-way.

14. Add note to General Construction Notes: A pre-construction field meeting shall be conducted with the City of Tucson Transportation inspector prior to any work within the public right-of-way.

15. Add note to General Construction Notes: Contractor shall obtain all permits required by governmental agencies.

16. Add note to General Construction Notes: The contractor shall comply with all applicable Occupational Safety and Health Administration regulations.

17. Add note to General Construction Notes: The extent and type of surface treatments/repairs indicated on the plans may not be all inclusive of the work that is needed. Additional repairs, paving, or replacement may be needed depending on field conditions.

18. Add note to General Construction Notes: The PIA Inspector shall verify that the "saw cut" line is located within competent pavement. Adjustments to the plan shall be documented and As-built; a one foot minimum shall be provided."

19. Add note to General Construction Notes: Upon commencement of work, traffic control devices shall be posted and maintained by the contractor until such time as the work is completed. All warning signs barricades etc. shall be in accordance with the manual on uniform traffic control devices adopted by the State of Arizona pursuant to A.R.S. 28-065. Contact Traffic Engineering, 791-4259, 48-hours prior to placing or removing any said traffic control devices.

20. Add note to General Construction Notes: Contractor shall call Blue Stake as mandated by the Arizona Revised Statutes at 1-800-782-5348 before any construction begins to verify location of existing public utilities shown or not shown. Existing utility locations shown hereon are only approximate. It is the contractor's responsibility to confirm horizontal and vertical location of all utilities without damaging same. Damaged utilities shall be repaired at no expense to the City.

21. Add note to General Construction Notes: Signage and striping should be coordinated with Traffic Engineering and installed at no expense to the public. Call Traffic Engineering at 791-4259 prior to the installation or removal of striping and signage.

22. Engineer of Record must provide written documentation that all utilities within the right of way have been cleared for construction.

23. Sheet 2, a road profile to include Left, Center, Right, and the EOP of striped paved roadways is required. Correct and revise.

24. Indicate a dimensioned detail of the curb access ramp to be built as part of the project. Truncated Domes required.

25. Sheet 2, Remove outline of trees and shrubs.

26. Sheet 2, use a light pen weight to indicate private property.

27. Sheet 2, Hinge point of slope/basin must be a minimum of 2-foot from fight-of-way. (Slope on private side). Indicate a cross section detail of right-of-way and water harvesting area.

28. As per the approved Tentative plat it shows the 100-year floodplain limits to be within the road way improvement. A Floodplain Use Permit is required for any construction on private or public property. A Floodplain Use Permit review is required by Development Services-Engineering section. Delineate 100-year floodplain on Sheet 2.

29. The Drainage Report does not demonstrate in how the off-site discharge will be accepted on-site. Also, the natural flows shall remain in its natural state without any obstructions. Justification is needed for the proposed curbing and 1-foot high berm in why it's not accepting the flows in its natural state.

30. Drainage design criteria for Local streets is given in Sec. 12.2 of Development Standard 10-02.0. The proposed paved road should show a dip crossing for the 100-year floodplain. Correct and revise.

31. Drainage Report, Exhibits A-C show solid black blocks. Correct for data to be read.

32. See redlines for additional comments.


Once changes, modifications, and or corrections are made to the PIA plan resubmitted and reviewed, further comment may result. See redlines for additional corrections. If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov
01/16/2007 ASHOFFS1 PIA COORDINATOR CUSTOMER CALLED Completed
01/16/2007 ASHOFFS1 PIA COORDINATOR OUT TO CUSTOMER Completed
12/13/2006 ASHOFFS1 ENGINEERING REVIEW Needs Review
12/13/2006 ASHOFFS1 UTILITY CLEARANCES COT STREETS DIVISION Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES PC WASTEWATER MGMT Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES QUEST COMMUNICATION Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES COX COMMUNICATION Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES SOUTHWEST GAS CORP Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES EL PASO NATURAL GAS Needs Review Submit Utility Clearance Letters
12/13/2006 ASHOFFS1 UTILITY CLEARANCES KINDER MORGAN ENERGY Needs Review Submit Utility Clearance Letters
12/15/2006 GARY WITTWER DOT LANDSCAPE REVIEW Denied There appears to be several trees within the construction area. I do not see any notes on the drawing to address them. Please address these trees and the Native Plant Preservation Ordinance. If you already have an approved site NPPO that includes the ROW. Please submit a copy with you next submittal.
12/15/2006 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond Place the PIA Case number on the cover sheet.