Plan Number: T06PI00051
Parcel: Unknown

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00051
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/25/2007 ASHOFFS1 ENGINEERING REVIEW Needs Review
01/25/2007 ASHOFFS1 UTILITY CLEARANCES COT STREETS DIVISION Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES QUEST COMMUNICATION Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES COX COMMUNICATION Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed Utility Clearance Letters rec'd 1-25-07.
01/25/2007 ASHOFFS1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed Utility Clearance Letters rec'd 1-25-07.
02/05/2007 GARY WITTWER DOT LANDSCAPE REVIEW Denied Irrigation Plan - You can not place private irrigation lines under public roadways. (Private lines can not be covered under "Blue Stake".)
02/09/2007 Blanca Espino DOT ENGINEERING REVIEW Denied PIA Plan
1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word sentences are unacceptable. Include plans/redlines from previous plan submittal.

2. Sheet 1, Title block, remove text "ENGINEERING LANDSCAPE ARCH". Correct and revise.

3. Sheet 1, Remove one of the Sheet Index.

4. Submit a copy of the approved documentation: Development Services Modification Request, Rezoning and Residential Cluster Project.

5. The Geotechnical Report does not include pavement section and reference soil recommendation for public roads. Correct and revise.

6. Sheet 1, Indicate the most recent recordation information of the Maps and Plats, Book & Page. Plat must be recorded before submittal of mylars for final review and approval. Correct and revise.

7. Sheet 1, Indicate 7951 E. Golf Links Road to be the Administrative address. Correct and revise.

8. Sheet 2, Detail ½ a 5-foot wide bike lane is required. Correct and revise.

9. Sheet 2, Details 3/2 indicate percentage of compaction. Correct and revise.
10. Sheet 2, A road profile is required and must include Left, Center, Right, and the EOP of striped paved roadways. A road profile is needed for pavement widening projects (Deceleration/Acceleration lanes). Correct and revise.

11. Sheet 2, Indicate Plan and Profile information for west entrance of Dee Jay Loop to the east entrance of Dee Jay Loop. Correct and revise.

12. Sheet 2, Indicate the Begin Curb Return (BCR) and End Curb Return (ECR) for each curb return.

13. Sheet 2, Indicate the Beginning and Ending stationing, offset, and elevations for Sawcut, Trim, Tack & Join areas. Existing pavement thickness and surface treatment shall be matched. Include a dimensioned pavement structural detail of area. Correct and revise.

14. As previously stated; Sheet 2, use a light pen weight & dashed line to show existing trees and or vegetation. 1st submittal line weight is acceptable. Correct and revise.

15. As previously stated; Sheets 3 & 4, Plan View; Delineate 6-foot sidewalk area with symbol as per what is shown in the Legend of Sheet 1. Correct and revise.

16. As previously stated; Provide a Curve and Line data table for all proposed curves and lines. Correct and revise.

17. As previously stated; Sheet 2, Indicate Off-site discharge amount and direction to be accepted On-site as per the approved Drainage Report.

18. As previously stated; Show drainage flow arrows along improvements. Indicate symbol in Legend of Sheet 1.

19. Sheet 3, Keynote 5; remove the word "ALTERNATIVE". Correct and revise.

20. Sheet 3, Keynote 7; Should read, "Sawcut 2' Max. Trim, Tack and Join to Match Existing Pavement". Correct and revise.

21. Sheet 3, Keynote 10 indicates existing 4' conc. sidewalk to remain. 6-foot wide sidewalks are required. Correct and revise.

22. Sheet 3, Use a light pen weight for Private development/improvements. Correct and revise.

23. Sheet 3, Indicate Stationing along street centerlines for Public areas only. Correct and revise.

24. Sheets 3 & 4, Keynotes are to be consistent on every page. See Keynote 8 on sheets 3 & 4. Correct and revise.

25. Sheets 3 & 4, Profile area is to show existing grades at both right-of-way lines and centerline alignment. The new grades shall be shown at centerline and both top of curb and gutter, or at edge of pavement if no curb is to be constructed. All three control lines will show elevations, stationing, percent of grade and all necessary related profiles pertaining to existing sanitary sewers, storm sewers and utilities.

26. Sheet 4, Align Stationing in the Plan and Profile views. Correct and revise.

27. As previously stated; Indicate a dimensioned detail for each type of curb access ramp to be built as part of the project must be shown. Truncated Domes required.

28. Attach is a copy of the PIA Guidelines and Checklist. These items are required in order to have approval of plans.

29. See redlines for other corrections.
02/09/2007 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed these plans and have the following comments:

1. Please provide a Streets and Traffic Maintenance Signature Block.

Previous comments addressed.
No further comments. 2/9/07
02/15/2007 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond February 15, 2007
ACTIVITY NUMBER: T06PI00051
PROJECT NAME: Barrio Pantano
PROJECT ADDRESS: 7901 E Golf Links Rd
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering recommends a conditional approval of the PIA Plan; therefore the following item must be revised or added to the plan prior to mylar approval.

1. The 'RIGHT TURN' (R3-5F) supplement plaques are not needed under the two stop signs (i.e. at Dee Jay Loop). See redlines for clarification.


If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov
02/20/2007 ASHOFFS1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
02/20/2007 ASHOFFS1 PIA COORDINATOR OUT TO CUSTOMER Completed