Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
06/28/2007 | ASHOFFS1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
07/11/2007 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. NPPO approved. 2. Have you redesigned the irrigation system? Will that come under new submittal? 3. The section on Benson Highway appears to be dirt on concrete as stated in your response. |
07/25/2007 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approv-Cond | We have reviewed this plan and have the following comments: 1. No private irrigation lines under public roadways. 2. We understand that there will not be any landscaping installed that will be maintained by the City of Tucson. No further comments. |
07/26/2007 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | |
07/26/2007 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | July 25, 2007 SUBJECT: Irvington Place, PIA Plan T06PI0049 PROJECT REVIEWER: Richard Leigh, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Sheet 2, Curb Access Detail: Revise as noted on red lined plan set. 2. An easement will have to be provided for the proposed retaining wall footers along Julian Crossing Way. Maintenance access should also be included in the easement. 3. Sheet 3: Provide complete right and left roadway profiles for Julian Crossing Way. Include all pertinent information. Additionally, label roadway cross slope transitions. 4. Provide a hydraulic analysis supporting the proposed storm drain across Julian Crossing Way at Sta. +/- 20+40 and the storm drain and catch basin between Sta. +/- 18+70 and 19+00, RT (Julian Crossing Way). These storm drains have not been addressed in the submitted drainage report. 5. Sheet 7: Provide a double pipe RCBC penetration detail, include dimensions. 6. Sheet 7, Detail D: Provide footer for the proposed cut-off wall. Additionally, the cut-off wall must extend to the calculated design scour depth. 7. Provide a retaining wall penetration detail for the pipe culvert crossing at 22+83 (Julian Crossing Way). Additionally, scour protection will be required for the culvert outlet. 8. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsoz.gov |
09/12/2007 | LHENDRI1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
09/12/2007 | LHENDRI1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |