Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T06PI00049
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/11/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/11/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/27/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. The pork-chop at Campbell and the other islands at the project entry need to be addressed. I suggest that you concrete them in. The City will not maintain landscaping in these islands. Private irrigation lines can not be placed under public roadway. 2. Please submit you approved NPPO site plan. I am looking to see if all of the ROW was included in the inventory. |
11/01/2006 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | An approved Tentative Plat is required. |
11/06/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reiviewed these plans and have the following comments: 1. Sheet s 3 & 4 - Outlet Apron shows D50 rock at 24" and the mat thickness at 4". Please clarify. 2. Sheet 4 - Who will be responcible for the maintenance of the detension basin? 3. Sheet 4 - Plan shows a 36" culvet. Is there a plan for erosion control at the outlet? 4. General - There are several sidewalk scuppers on the plans, is there any planned erosion control at the outlets of these scuppers? 5. Is there any planned landscping with this project? If so please submitt the landscape plan to Paul Rosenboom at 4004 S. Park Avenue, BLD #2 (Phone 791-3154 ext 234). No further comments. 11/06/06 |
11/13/2006 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | November 13, 2006 ACTIVITY NUMBER: T06PI00049 PROJECT NAME: Irvington Place PROJECT ADDRESS: 2252 E Benson Hwy PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. Please resubmit Traffic Engineering's redlines generated during this review. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. For clarification to the following comments please see Traffic's redlines. 3. Median improvements are needed along Kino Parkway to prevent left turn maneuvers off of Cherry Lynn Street onto Kino Parkway. See redlines for information sheet 5 of 7. 4. Need to delineate the pork chop with OM 2-2V(AD) per PCDOT & TDOT Signing Manual (2002) Chap 9-5C and 9-17. 5. Along Benson HWY at State Avenue install an R6-1(R) "ONE WAY" Sign in the median per PCDOT & TDOT Signing Manual (2002) Chap 9-3A. 6. Sheet 7 of 7: Provide a 'ONE WAY' (R6-1) over the proposed (R1-1), but under the street names per PCDOT & TDOT Signing Manual (2002) Chap 9-3B. 7. If Cherry Lynn Street and State Avenue are public then install R2-1 (i.e. 25MPH Speed Limit Sign) at the proposed roadway entering this development off of Kino Parkway and Benson HWY per PCDOT & TDOT Signing Manual (2002) Chap 9-10. 8. Add symbols used for new street signs in the legend in accordance with Standard Details for Public Improvements, SD100, 2003 edition. 9. The typical section on sheet 2 Section C (Collector Street Cross Section) does not match the pavement marking as shown on sheets 5-7. Please revisit and clarify. Following comment 10 pertains and is affected by this comment. 10. If applicable, show no parking signs where there is to be no parking along State Avenue and Cherry Lynn Street. Provide signs in both plan and section. 11. Along Kino Parkway and Benson HWY place an additional 'RIGHT ONLY' (R3-5R ) sign at the beginning of the right turn lanes per PCDOT & TDOT Signing Manual (2002) Chap 9-5D 12. Provide a 'RIGHT LANE' (R3-5F) supplemental plaque under the new (R3-5R) along Golf Links Road. 13. See redlines for revisions required to the general notes on sheets 1 and 2. 14. Add the following Signing General Notes 1, 5(a), & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans. Add the following Pavement Marking/Striping General Notes to the Plans: 'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.' 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov |
11/16/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
11/16/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |