Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T06PI00042
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2007 | ASHOFFS1 | ENGINEERING | REVIEW | Passed | |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/12/2007 | ASHOFFS1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
01/22/2007 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Still no NPPO submittal. |
02/08/2007 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | February 8, 2007 ACTIVITY NUMBER: T06PI00042 PROJECT NAME: Southgate Business Park PROJECT ADDRESS: 1979 E Ajo Way PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering recommends a conditional approval of the PIA Plan. The following items must be revised or added to the plan. Provide a PDF of the revised drawing to verify that the following items have been addressed prior to submitting the mylar drawings. 1. See redlines on the submitted drawings and address the additional redline comments. 2. Sheet 6 of 7: In error Rick Engineering was instructed to install a 'RIGHT LANE' (R3-5F) supplemental plaque under all new (R3-5R) along all proposed right turn bays. These plaques are not required under the two proposed stop signs. See Redlines for clarification. 3. Sheet 6 of 7: In error Rick Engineering was instructed to install an R6-1(R) "ONE WAY" Sign in the median at both driveway locations along Ajo Way. Since these are driveways the one way signs are not required. Please remove the proposed one way signs from the striping plan. See redlines for clarification. 4. Sheet 6 of 7: Provide an object marker (OM2-2V(AD) in the bull nose at the southern Kino driveway per PCDOT & TDOT Signing Manual (2002) section 9-17. If you have any questions, I can be reached at 791-4259 x 76730 or Jose.Ortiz@tucsonaz.gov |
02/12/2007 | ASHOFFS1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
02/12/2007 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
02/12/2007 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | Ok to submit mylars for final approval and signing after final plat recorded. Additionally, a detailed itemized bid estimate for all the proposed improvements in the public ROW, excluding wet and dry utilities, will have to be submitted to this office for review. The bid estimate must include item description, item quantity, unit cost, unit cost total and a grand total for the materials, labor, and all other related costs, including all applicable taxes. |
02/12/2007 | ASHOFFS1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |