Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T06PI00042
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/28/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY CLEARANCE LETTERS. |
11/03/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. See #1 submittal review. Nothing submitted this round. |
11/14/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed these plans and have the following comments: Landscaping 1. Any landscaping that is part of this project needs to be reviewed by Paul Rosenboom, 4004 S. Park Avenue, Bld #2, 791-3154 ext 234. 2. All work around existing City irrigation lines and landscaping needs to be coordinated with Paul Rosenboom at 791-3154 ext 234. No further comments. 11/14/06 |
11/16/2006 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | November 15, 2006 ACTIVITY NUMBER: T06PI00042 PROJECT NAME: Southgate Business Park PROJECT ADDRESS: 1979 E Ajo Way PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The plans did not appear to address the previous comments posted by Traffic Engineering. Please revisit and address the comments posted below. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. Sheet 5 of 6: Install an R6-1(R) "ONE WAY" Sign in the median along at both driveway locations along Ajo Way per PCDOT & TDOT Signing Manual (2002) Chap 9-3A. 3. Sheet 5 of 6: Install an R1-1 (Stop Sign) at the proposed driveway of this development off of Ajo Way (approximately Sta. 12+90) per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2. 4. Sheet 5 of 6: Provide a 'RIGHTONLY' (R3-5R) under the proposed (R1-1) at the two driveways along Ajo Way 5. Sheet 5 of 6: Provide a 'RIGHT LANE' (R3-5F) supplemental plaque under all new (R3-5R) along all proposed right turn bays. 6. Sheet 5 of 6: In addition to the solid 6" white striping (WS6), for all right turn bays, raised pavement markings should be included (WS6-G20) per PCDOT & TDOT Pavement Marking Design Manual Sheet 4-13. 7. Sheet 5 of 6: Due to the configuration of the entrance at the southern entrance along the connection ramp treat the bull nose with something similar to the Pavement Marking Manual sheet 5-16 and the Signing Manual 9-5A (OM1-3 per sheet 9-14). 8. Sheet 2 of 6: Revise Striping note 1 to refer to the 2003 Edition of the PC/COT Standards and Specifications (not 1994). FYI the latest edition of the Pavement Marking Manual is 2002. 9. Sheet 2 of 6: Revise the Signing Note 1 to refer to the 2003 edition of the MUTCD (not 2000) 10. Sheet 2 of 6: revise Signing Note 6 "TYPE II" should read "TYPE IV ASTM" 11. Add the following Pavement Marking/Striping General Notes to the Plans: 'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.' If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov |
11/21/2006 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | November 20, 2006 SUBJECT: Southgate Business Park, PIA Plan T06PI0042 PROJECT REVIEWER: Richard Leigh, Senior Engineering Associate, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following must need to be addressed in the next submittal. 1. Indicate book and page on cover sheet. Plat must be recorded before submittal of mylars for final review and approval (reminder). 2. Indicate Flooplain Use permit number in note No. 21. 3. Include percent of effective air voids in pavement structural section Detail B/2. 4. Provide details for the relocation of existing streetlights. 5. Check cross section references so that they correlate with proper cross section there appears to be some confusion. 6. Include all details any proposed storm drain (bleeder pipes) within the public right-of-way for this project If you have any questions, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsoz.gov |
12/08/2006 | ASHOFFS1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
12/08/2006 | ASHOFFS1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |