Plan Number: T06PI00037
Parcel: Unknown

Address:
4275 N STONE AV

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00037
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2007 ASHOFFS1 ENGINEERING REVIEW Needs Review
01/02/2007 Estevan Tineo DOT ENGINEERING REVIEW Denied January 2, 2007 T06PI00037 STONE LANE TOWN HOMES: The following comments, at a minimum, must be addressed in the next submittal.

1. Previous comment 2 not addressed. Use correct Title blocks.
2. Previous comment 3 not addressed. Provide Book and Page.
3. Previous comment 8 not addressed.
4. Previous comment 10 not addressed.
5. Previous comment 12 not fully addressed. I have attached a copy of the detail that should be used and included in the plans. In addition, please call truncated domes.
6. Previous comment 14 not addressed. Will the public sewer be installed with these plans or under a separate plan. If the sewer is to be installed with this plan then include the sewer and included Pima County Waste Water signature line. If not then submit a separate plan for my review.
7. Sheet 2 of 2: The plan view indicates cross hatching along the south side of the existing sidewalk but the plan LEGEND does not provide a definition for this type of hatching? Please revise.
8. Sheet 2 of 2: The approved Tentative Plat seems to indicate that 6' sidewalk is required along Stone Avenue. If 6' sidewalk is required then the PIA plan must indicate new 6' sidewalk, adding sidewalk (in this case I believe adding 1' to make 6' sidewalk) to existing sidewalk is not allowed. Revise accordingly.
9. Sheet 2 of 2: The approved Tentative Plat indicates a new Fire Hydrant in the r/w but the PIA plan does not indicate any Fire Hydrant? Please revise plan accordingly, the hydrant must not be located in the sidewalk.
01/02/2007 ASHOFFS1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
01/02/2007 ASHOFFS1 PIA COORDINATOR OUT TO CUSTOMER Completed
12/01/2006 ASHOFFS1 UTILITY CLEARANCES COT STREETS DIVISION Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES QUEST COMMUNICATION Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES COX COMMUNICATION Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied Need Utility Clearance letters.
12/01/2006 ASHOFFS1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied Need Utility Clearance letters.
12/05/2006 JOSE ORTIZ DOT TRAFFIC REVIEW Denied December 5, 2006
ACTIVITY NUMBER: T06PI00037
PROJECT NAME: Stone Lane Townhomes
PROJECT ADDRESS: 4275 N Stone Avenue
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised Plan is required for resubmittal.

The following items were not addressed during the last review and must be revised or added to the plan prior to approval.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. Illustrate the location of signage along Private Street A that is in public right of way (i.e. STOP SIGN, R1-1).

3. Install an R6-1(R) "ONE WAY" Sign in the median per PCDOT & TDOT Signing Manual (2002) Chap 9-3A.

4. Provide an end median signage treatment per PCDOT & TDOT Signing Manual (2002) Chap 9-4A & 9-4B.

5. Re-stripe the bike lane along Stone Avenue at the access point into this development per PCDOT & TDOT Pavement Marking Design Manual (200) Chapter 3-4.

6. Re-stripe the median end/gore transition per PCDOT & TDOT Pavement Marking Design Manual (2002) Chapter 4-4 and Chapter 5-13. If possible, match the existing striping taper and location of the gore transition.

7. Show existing striping in plan view to establish tie in points for the proposed striping.

8. Add symbols used for all new signs in the legend in accordance with Standard Details for Public Improvements, SD100, 2003 edition.

9. Sheet 1: Revise note 29. The note should refer to the City of Tucson and not Pima County.

10. This project requires minimal pavement marking due to the revisions to the median along Stone Avenue. Therefore add the following 8 General Notes per PCDOT & TDOT Pavement Marking Design Manual (2002) Chapter 2-1: Notes 1, 2, 5, 10, 13, 14, 16 and 17.

11. Add the following Signing General Notes 1, 2, 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans.

12. Add the following General Notes to the Plans:

'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.'

'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.'

'ALL RAISED PAVEMENT MARKERS (RPM's) SHALL BE INSTALLED SO THAT THE REFLECTIVE FACE OF EACH MARKER IS FACING THE DIRECTION OF TRAFFIC AND IS PERPENDICULAR TO THE DIRECTION OF TRAFFIC FLOW.'




If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov
12/08/2006 GARY WITTWER DOT LANDSCAPE REVIEW Denied It appears that none of the previous comments were addressed. See previous comments.
12/27/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

It appears that the previous landscaping comments have not been addressed. Please address these items.

No further comments. 12/27/06