Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T06PI00037
Review Name: PIA SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 07/21/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
| 08/01/2006 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | August 1, 2006 ACTIVITY NUMBER: T06PI00037 PROJECT NAME: Stone Lane Townhomes PROJECT ADDRESS: 4275 N Stone Avenue PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised Plan is required for resubmittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. The proposed curb line does not tie into the existing curb line. Please clarify and confirm limits of work. 3. Illustrate the location of signage along Private Street A that is in public right of way (i.e. STOP SIGN, R1-1). 4. Install an R6-1(R) "ONE WAY" Sign in the median per PCDOT & TDOT Signing Manual (2002) Chap 9-3A. 5. Provide an end median signage treatment per PCDOT & TDOT Signing Manual (2002) Chap 9-4A & 9-4B. 6. Re-stripe the bike lane along Stone Avenue at the access point into this development per PCDOT & TDOT Pavement Marking Design Manual (200) Chapter 3-4. 7. Re-stripe the median end/gore transition per PCDOT & TDOT Pavement Marking Design Manual (2002) Chapter 4-4 and Chapter 5-13. If possible, match the existing striping taper and location of the gore transition. 8. Show existing striping in plan view to establish tie in points for the proposed striping. 9. Add symbols used for all new signs in the legend in accordance with Standard Details for Public Improvements, SD100, 2003 edition. 10. Sheet 1: Revise note 29. The note should refer to the City of Tucson and not Pima County. 11. This project requires minimal pavement marking due to the revisions to the median along Stone Avenue. Therefore add the following 8 General Notes per PCDOT & TDOT Pavement Marking Design Manual (2002) Chapter 2-1: Notes 1, 2, 5, 10, 13, 14, 16 and 17. 12. Add the following Signing General Notes 1, 2, 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans. 13. Add the following General Notes to the Plans: 'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.' 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' 'ALL RAISED PAVEMENT MARKERS (RPM's) SHALL BE INSTALLED SO THAT THE REFLECTIVE FACE OF EACH MARKER IS FACING THE DIRECTION OF TRAFFIC AND IS PERPENDICULAR TO THE DIRECTION OF TRAFFIC FLOW.' If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov |
| 08/17/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | The median island extension on Stone will need to be landscaped. The bull nose should have stamped concrete to match the other end. Provide a planting plan and extend the existing irrigation system. Please contact Street at 791-5279 ext. 123 for irrigation information. Call Gary at 791-3115 ext. 414 for design concept review prior to next submittal. |
| 08/17/2006 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | (T06PI00037 STONE LANE TOWN HOMES): The following comments, at a minimum, must be addressed in the next submittal. 1. Sheet 1 of 2: Provide the project administrative address. 2. Sheet 1 of 2: Use the correct COT DOT Permits and Codes Title blocks, see DOT Maps and Records for Title block. 3. Sheet 1 of 2: Provide the development Book and Page under project title. 4. Sheet 1 of 2: Revise general notes, remove all reference to Oro Valley. 5. Sheet 1 of 2: Remove signature line for Pima County Development Services. 6. Sheet 1 of 2: Include the notes as attached on this sheet. 7. Sheet 2 of 2: Plan view and detail A, indicate limits of pavement removal and replacement for proposed median installation. 8. Sheet 2 of 2: Include Landscape Details if landscaping is proposed as indicated in section A. 9. Sheet 2 of 2: Provide 6" vertical curbing for proposed median. 10. Sheet 2 of 2: Call Standard Detail for Medial "nose". 11. Sheet 2 of 2: Clearly indicate Construction CL. 12. Sheet 2 of 2: Include ramp detail for proposed ramps, the ramps must include truncated domes per ADA. 13. Sheet 2 of 2: Call out vertical curbing for proposed driveway entrance, and clearly stationing relative to CL. 14. Sheet 2 of 2: The proposed sewer connection, in the City right-of-way, must be public. Revise. |
| 08/17/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed these plans and have the following comments: 1. Sheet 1 - Need a Streets and Traffic Maintenance signature block. 2. Note 12- This note mentions meeting codes for the Town of Oro Valley and should be the City of Tucson. 3. Sheet 2 - Landscaped Medians - Is there a plan that shows the proposed landscaping for the medians? Landscape Comments: 1. You need 4" sleeves that cross from the west side to the median for the irrigation. 2. South end landscaping should match the north end. 3. Coordinate any irrigation with Paul Rosenboom, Street Maintenance Supervisor, 791-5279 ext 234, or 237-7386. No further comments. 8/17/06 |
| 08/24/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
| 08/24/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |