Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T06PI00035
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
05/01/2007 | ASHOFFS1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
05/29/2007 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | 05/29/2007: (T06PI00035) Tucson Mall Oil Stop - Storm drain modification, the following comments, at a minimum, must be addressed in the next submittal. 1. Sheet 2 of 2: Title block is not correct, revise accordingly. 2. Sheet 2 of 2: Per previous comment a 10' minimum easement (including the pipe) must be provided on each side of the pipe. The easement width appears correct, along the majority of the pipe, but does appear correct at the extreme ends, please check. 3. Sheet 2 of 2: Is TEP "OK" with the proposed storm drainpipe easement encroaching into to their existing transformer/transformer easement? Transformer (and associated easement) 4. Sheet 2 of 2: Is it ok for the proposed building footprint to encroach onto the proposed storm drainpipe? |
06/04/2007 | ASHOFFS1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
06/04/2007 | ASHOFFS1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |