Plan Number: T06PI00035
Parcel: Unknown

Address:
4500 N ORACLE RD

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00035
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/05/2006 TAMI HAUSER ENGINEERING REVIEW Needs Review
09/05/2006 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/05/2006 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Needs Review SUBMIT UTILITY CLEARANCE LETTERS
09/14/2006 Estevan Tineo DOT ENGINEERING REVIEW Denied 9/14/2006: (T06PI00035) Tucson Mall Oil Stop - Storm Drain modification
The following comments, at a minimum, must be addressed in the next submittal.

1. Sheet 1 of 2: Provide the notes as attached on this sheet. Notes provided but Storm Drain notes must be modified. Change Not 5. To read as note 25 (under grading notes) and note 6 with note 29 (under grading notes).
2. Sheet 2 of 2: Detail proposed storm drain junction structures in this plan set. This comment has not been addressed. Detail Storm drain junction structures on the plan sheet.
3. Sheet 2 of 2: Storm Drain easement, provide recordation for new storm drain easement.
4. Does the proposed storm drain modifications convey the design flow as under existing conditions? Was the proposed storm drain hydraulic grade line considered in design the proposed storm drain modifications? This comment has not been addressed. Provide a HGL analysis demonstrating that the proposed modifications (the calcs must take into account both minor and junction structures head loss) will not result in upstream issues (will not increase the HGL at most upstream end of the storm drain system).
5. Provide the DSD floodplain Use Permit Number (note 28) for the proposed drainage modifications.
09/29/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond We have reviewed these plans and have the following comments:

1. Sheet 2 - Storm drain manhole # 4 is labeled # 3.

Landscaping
1. The City does have irrigation lines along the north and west shoulders. Work around these lines needs to be corrdinated with Paul Rosenboom at 791-3154, exct 234.

No further comments. 9/29/06
10/09/2006 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
10/09/2006 THAUSER1 CONSTRUCTION ESTIMATE REVIEW Needs Review
10/09/2006 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed