Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T06PI00035
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/27/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
07/11/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed these plans and have the following comments: 1. Sheet 2 of 2 - Manhole Number 4 - Is this manhole a new, or existing manhole? 2. Sheet 2 of 2 - There needs to be a manhole detail, or a standard detail called out. No further comments. 7/11/06 |
07/11/2006 | DALE KELCH | DOT TRAFFIC | REVIEW | Approved | Traffic Engineering has no comments on these storm drain plans. Diahn L. Swartz, P.E., PTOE Traffic Engineering Project Manager City of Tucson 201 N. Stone Ave, 5th Floor PO Box 27210 Tucson AZ 85726-7210 (520) 791-4259 (520) 791-5526 Diahn.Swartz@tucsonaz.gov |
07/19/2006 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | 7/19/2006: (T06PI00035) Tucson Mall Oil Stop - Storm Drain modification The following comments, at a minimum, must be addressed in the next submittal. 1. Sheet 1 of 2: Provide the notes as attached on this sheet. 2. Sheet 2 of 2: Detail proposed storm drain junction structures in this plan set. 3. Sheet 2 of 2: Storm Drain easement, provide additional area (10' on each side of pipe) per City of Tucson Drainage Manual, Section 10.9.22. 4. Sheet 2 of 2: "Storm Drain…" not Storm Sewer…", revise. 5. Sheet 2 or 2: Provide stationing relative to Stone Avenue. 6. Does the proposed storm drain modifications convey the design flow as under existing conditions? Was the proposed storm drain hydraulic grade line considered in design the proposed storm drain modifications? |
07/28/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
08/08/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
08/08/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |