Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T06PI00022
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/11/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed these plans and have the following comments: 1. Sheet 2 and 6 - Please provide a sawcut note to show where the existing pavement should be sawcut. 2. Sheet 3 - Who will be responcible for the maintenance of the common area? 3. Sheet 7 - All curb access ramps need to have truncated domes. 4. Sheet 7 - Details 2, 2A, 3 - Please show sawcutting the existing pavement a minimum of 1' into sound pavement. Also, what is the pavement section for the new pavement being added? No further comments. 5/11/06 |
05/15/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. Please submit your approved NPPO plan. The trees within the ROW need to be included in the survey. 2. Please submit your irrigation plan for the common areas. Note: Private irrigation lines are not allowed under public roadways. |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/17/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | SUBMIT UTILITY CLEARANCE LETTERS |
05/18/2006 | DALE KELCH | DOT TRAFFIC | REVIEW | Denied | Traffic Engineering REJECTS this PIA submittal: 1. Add a paving note to read “All non-signalized intersection street names must have E-W block number addresses for E-W roadways and N-S block number addresses for N-S roadways.” 2. There are no proposed signs submitted with this plan. This plan requires stop signs, no parking signs in cul-de-sacs, no outlet signs for cul-de-sacs and speed limit signs. Resubmit with sign locations and appropriate MUTCD designations and the required signing notes from the PC/COT Signing Manual. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
05/18/2006 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | PIA Plan 1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal. 2. Title blocks should follow the COT-Engineering Division Active Practices Guidelines. See Attached. 3. Indicate Maps and Plats, Book and Page information on cover sheet. Plat must be recorded before submittal of mylars for final review and approval. 4. In title block, add assigned I-Plan Number, I-2006-024 to all sheets. 5. Indicate Administrative Address on cover sheet of plans. Correct and revise. 6. Sheet 7, General Note 3, indicates Chip seal will not be required. Sheet 6 calls for Chip seal area on Medina Road. Correct and revise. 7. Add note to General or Paving Notes: Engineer of Record must provide written documentation that all utilities within the right of way have been cleared for construction. 8. Add note to General or Paving Notes: All changes to these plans must be approved by the Tucson City Engineer's Permits and Codes Unit, prior to construction. 9. Add note to General or Paving Notes: The contractor shall contact and/or coordinate any work with COT Streets & Traffic Maintenance Division, Median Island Maintenance Section (791-5279, ext. 234) prior to disturbing any COT/DOT landscaping or irrigation systems. Additionally, the contractor shall repair or replace any disturbed COT/DOT landscaping or irrigation systems, including replacement of any damaged plants. 10. Add note to General or Paving Notes: The Engineer of Record shall field verify that the "saw cut" line is located within competent pavement. Adjustments to the plan shall be documented and As-built; a one foot minimum shall be provided." 11. If applicable, add note to General or Paving Notes: Floodplain Use Permit No._______, has been issued by Development Services Department for work impacting City and FEMA Floodplains. 12. Key Note 7, indicate sidewalk width. 13. Key Note 8, indicate a dimensioned detail. 14. Key Note 9, is called out on Sheet 5 but there's no symbol indicating a Sidewalk Scupper Type 3. Correct and revise. 15. Key Note10, call out detail 7, Sheet 7. Correct and revise. 16. Key Note12, call out detail 4, Sheet 7. Correct and revise. 17. Key Note 17, indicate how many cells. Correct and revise. 18. Key Notes 19 & 20, indicate a pavement patch detail for both types and add note "Modify to 6-inches thickness for AB or Concrete sub-base". Correct and revise. 19. Profile sections, call out "Top of Curb". 20. Sheet 2, Indicate distance between survey monument and new manhole. Correct and revise. 21. Sheet 2, calls out 6'x 296' Pavement Patch, indicate patch area on Sheet 7, detail 3. 22. Sheet 3, correct stationing for new manhole #3. 23. Sheet 3, add Key Note #14 to Sta. 3+04.02, Manor View Road. See redlines. 24. Sheet 3, Profile area between Sta. 5+00 & 6+00, correct text. See redlines. 25. Sheet 4, street centerline (Stationing text) is too small. Proper height is .125" Correct and revise. 26. Sheet 4, Medina Rd. indicates Key Note 20 being called out as pavement patch, but the hatch calls out Chip Seal. Correct and revise. 27. Sheets 4, 5 & 6, Indicate Line and Curve data on plan view. 28. Sheet 5, calls out Key Note 6 - Vertical curb, yet Detail 1, Sheet 7 indicates a wedge curb. Correct and revise. 29. Sheet 5, Key Note 9 is being called out but there's no symbol indicating a sidewalk scupper. 30. Sheet 5, indicates a sidewalk scupper with 7 cells, indicate a dimensioned detail. 31. Sheet 5, Cul-de-sac area indicates a symbol that does not look like a new manhole per Key Note 15. Correct and revise. 32. Sheet 5, Hinge point of slope/basin must be a minimum from 2' ROW (slope on private side). Slopes greater than 4:1 and deeper that 2' require barricade railing. Correct and revise. 33. Sheet 6, between Stations 62+00 & 63+00 calls out Chip seal Area, add note: Standard Specification 404-3.16. Correct and revise. 34. Indicate all proposed drainage structure/scupper details (dimensioned). 35. Indicate a dimensioned detail of each type of proposed curb access ramps. Sheet 7, detail 7 indicates a 4-foot wide sidewalk. The acceptable width is 5-feet and truncated domes are required. Correct and revise. 36. Key Notes 19 & 20, add note "to modify to 6 inches thickness for AB or concrete sub-base". Indicate a dimensioned detail on sheet 7. 37. Sheet 7, Paving Notes #3, Will Chip seal be required for this project or not? 38. Detail 1, Relocated text above text line. See redlines. 39. Detail 3, Depict Pavement Patch area on street section. 40. Sheet 7, Indicate a dimensioned Pavement structural detail. Indicate % compaction. Indicate detail Trim, Tack & Join. See redlines. 41. Details 2, 2A, 5 & 7 show a 4-foot wide sidewalk. 5-foot wide sidewalks are required as per D.S. 3-01.4.1.A.1.a Correct and revise. 42. Submit Utility Clearance Letters to Tami Hauser, DSD PIA coordinator to track letters. See attached. 43. Based on the approved Mylars, DOT Permits and Codes will conduct a PIA pre-construction meeting with the Developer, Engineer of Record, and Contractor, and issue the approved permit application. Based on the approved permit application, DSD will collect applicable fees (5% of total construction costs) and issue the Excavation Permit to work in the Public right-of-way. 44. See redlines for additional comments. |
06/01/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
06/01/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |