Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T06PI00018
Parcel: Unknown

Address:
4252 N 1ST AV

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00018
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/26/2006 TAMI HAUSER ENGINEERING REVIEW Needs Review
06/26/2006 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Completed SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
07/10/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed these plans and have the following comments:

1. For all landscaping in the right of way, please submit the landscaping plan to Paul Rosenboom at 4004 S. Park Avenue (Phone:791-3154) for review and approval.
2. Sheet 6 of 11 - Arterial Details - Please check proposing a pavement section of 2 inches of asphalt over 4 inches of aggregate base. That is the typical section for a residential street, not an arterial roadway.
3. Sheet 6 of 11 - Detail 5 - Which asphalt mix is to be used for the paving? Is it PAG Mix #1, Mix #2, or Mix #3?

No further comments. 7/21/06
07/10/2006 RICHARD LEIGH DOT ENGINEERING REVIEW Denied SUBJECT: Rillito Crossing Market Place, PIA Plan T06PI0018, Second Submittal.

PROJECT REVIEWER: Richard Leigh, Senior Engineering Associate Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Indicate book and page on cover sheet. Plat must be recorded before submittal of mylars for final review and approval. (Reminder)

2. Revise pavement cross sections, detail 1/6 and 4/6, to indicate a minimum pavement section of 3" of AC and 6" of AB and provide a pavement structural detail.

3. Provide proposed asphalt mix in detail 5/6.

4. Provide a 6" vertical curb with terminal sections at the back of the northern curb access ramp at the northeast corner of 1st Avenue and Limberlost Road.

5. Provide applicable construction details for the bus pull out on this plan set (pavement structural section, cross sections, joint details, etc.).

If you have any questions, I can be reached at 791-3115 ext.448 or Richard.Leigh@tucsoz.gov
07/11/2006 DALE KELCH DOT TRAFFIC REVIEW Denied T06PI00018
Rillito Crossing Market Place
2nd Submittal due July 24, 2006

The following are Traffic Engineering comments to this plan set:

Sheet 1/11, Cover Sheet: Replace “Limberlost Dr” with “Limberlost Rd” in all cases (at least four times, including Title, Plan View, Key Map, Location Map).

Sheet 2/11: Replace “Limberlost Dr” with “Limberlost Rd” in all cases (at least one in plan view).

Sheet 2/11: Need minimum 15 ft between new median and existing curb for EB Limberlost (see other related comments, below).

Sheet 3/11: Replace “Limberlost Dr” with “Limberlost Rd” in all cases (at least one in plan view).

Sheet 5/11, First Ave: Show crosswalk striping at Limberlost. New ramps are being places at NE corner of Limberlost/1st. The crosswalk needs to line up with the new ramp. (If it doesn’t, it will need to be restriped.)

Sheet 5/11, First Ave: Place R3-5f (“Right Lane”) below each R3-5R sign, per 2003 MUTCD ( Total seven times).

Sheet 5/11, First Ave: Remove RPMS from bike lane; replace WS8-C20 with WS8 (six references).

Sheet 5/11, First Ave: At exits onto First Avenue (except the northernmost one), use a WG8 (2x6) on the right hand side to guide exiting motorists into the nearest through lane. The WG8(2x6) should have a minimum 25 ft radius and arc from either middle of the curb radius or the top of the sidewalk ramp.

Sheet 5/11, First Ave, Traffic Island at northernmost driveway: Use YS4 sted WS8-C20 around the island.

Sheet 5/11, First Ave, Traffic Island at northernmost driveway: Post a Do Not Enter sign (R5-1) facing west (eastbound), so SB First Avenue drivers understand they may not make a left turn into this driveway.

Sheet 5/11, First Ave, Traffic Island at northernmost driveway: Post a No Left Turn Sign across from the Do Not Enter sign (see comment above).

Sheet 5/11, Limberlost Rd: Our policy specifies that10 ft lanes require approval from Jim Glock, Director of Transportation. I have asked the director via email for approval for 10 ft lanes for Limberlost Road east of 1st Avenue, approximately 260 ft. He has provided that approval via email 7/11/06.

Sheet 5/11, Limberlost Rd: Show new crosswalks at traffic signal. New curb ramps at NE corner may result in existing crosswalks failing to match up with the new curb ramp.

Sheet 5/11, Limberlost Rd: Specify median end treatment per the PCDOT/COT Pavement Marking Design Manual Sheet 5-13.

Sheet 5/11, Limberlost Rd: Need 15 ft min. from median to south curb.

Sheet 5/11, Limberlost Rd: Remove legends from left turn bay.

Sheet 5/11, Limberlost Rd: Replace WS8-C20 with WS8 for bike lane (three references).

Sheet 5/11, Limberlost Rd, traffic island at exit: Replace WS8-C20 with YS4.

Sheet 5/11, Limberlost Rd, traffic island at exit: Use a WG8 (2x6) on the right hand side to guide exiting motorists into the nearest through lane. The WG8(2x6) should have a minimum 25 ft radius and arc from either middle of the curb radius or the top of the sidewalk ramp.

Sheet 5/11, Limberlost Rd, Sta 12+56.69: Add an R3-5f (“Right Lane”) to the sign assembly that includes the R1-1 and R3-5R.

Sheet 5/11, Limberlost Rd, Sta 13+22.77: Specify median end treatment per the PCDOT/COT Pavement Marking Design Manual Sheet 5-13.

Sheet 5/11, Limberlost Rd: FYI, A bike lane that is not adjacent to a curb may be as narrow as 4 ft.

Sheet 5/11, Limberlost Rd. WB through lane transitions from 10 ft at STA 18+50 to almost 20 ft at approx STA 17+70 back to 10 ft at approx. STA 13+15. Please try to smooth out these transitions.

Sheet 6/11, Limberlost Road Proposed Cross Section: As mentioned above, the 11-ft through lane on the south side of Limberlost is too narrow. We require a minimum of 15 ft from curb to curb. The new raised median should be closer to the construction center line. Ten-ft through lanes require approval from the director (received via email to Diahn Swartz on 7/11/06). A bike facility not adjacent to a raised curb may be as narrow as 4 ft, so you can gain an extra foot there. Per Vince Catalano, the median may be as narrow as 3 ft.


Diahn L. Swartz, P.E., PTOE
Traffic Engineering Project Manager
City of Tucson
201 N. Stone Ave, 5th Floor
PO Box 27210
Tucson AZ 85726-7210

(520) 791-4259
(520) 791-5526

Diahn.Swartz@tucsonaz.gov
07/28/2006 GARY WITTWER DOT LANDSCAPE REVIEW Approved
08/02/2006 THAUSER1 CONSTRUCTION ESTIMATE REVIEW Needs Review
08/02/2006 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Denied SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Completed SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Denied SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Completed SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Completed SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/02/2006 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Denied SUBMIT UTILITY CLEARANCE LETTERS FOR PIMA COUNTY WASTEWATER, COX COMMUNICATIONS, AND KINDER MORGAN ENERGY
08/07/2006 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
08/07/2006 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed