Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T06PI00017
Parcel: Unknown

Address:
7600 S KOLB RD

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00017
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/21/2006 TAMI HAUSER ENGINEERING REVIEW Needs Review
07/21/2006 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 THAUSER1 CONSTRUCTION ESTIMATE REVIEW Needs Review
07/21/2006 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Approved SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
07/21/2006 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Denied SUBMIT UTILITY CLEARANCE LETTER FOR KINDER MORGAN. IF THEY DO NOT REQUIRE A REVIEW, SUBMIT A UTILITY CLEARANCE LETTER STATING SUCH.
08/21/2006 Estevan Tineo DOT ENGINEERING REVIEW Denied T06PI00017 (La Estancia/Julian Wash Linear Park):

1. Sheet 1 of 4: Provide the book and page.
2. Sheet 1 of 4: Provide the Developer's / Owners contact information on the cover sheet.
3. Sheet 2 of 4: Provide the DSD Department Floodplain Use Permit number for the project as applicable.
4. Sheet 2 of 4: For D.G. Path Section: Call-out 95% compaction for Compacted Subgrade.
5. Sheet 2 of 4: For ASPHALT PATH SECTION: Call-out 95% compaction for Compacted Subgrade.
6. Sheet 2 of 4: For ASPHALT PATH SECTION: Call-out NO.2 mix for asphalt section.
7. Sheet 2 of 4: For ASPHALT PAVED PATH: Call-out 100% compaction for 6" ABC.
8. Sheet 3 of 4: For Details E, F, and G: These details must reference the PIA Plan set (I-2001-026) for the "existing bridges".
9. General comment: The existing Julian Wash improvements (I-2001-026) including modifications (bridges) must be constructed and accepted (in accordance to the PIA contract) before these improvements (T06PI00017) are installed.
08/29/2006 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. The City Parks and Recreation Department will be maintaining this project. Please contact them to review for irrigation equipment. Irrigation Controller, valves etc. Get Parks to approve and copy me.
09/01/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed these plans and have the following comments:

Landscaping

1. Our comments are basically the same as Gary Wittwer's. Paul Rosenboom would like to see an approved landscape plan from Parks.

No further comments. 9/1/06
09/11/2006 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
09/11/2006 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed