Plan Number: T06PI00016
Parcel: Unknown

Address:
7600 S KOLB RD

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00016
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/14/2006 Estevan Tineo DOT ENGINEERING REVIEW Approv-Cond 0/9/2006: T06PI00016: (Please note it's the responsibility of the Design Engineer - Castro Engineer - to prepare plans in accordance to all applicable Standards and Ordinances, any issues encountered during construction shall be addressed by the Engineer - in this case Castro Engineer - at no cost to the City).

Conditional approval on the following conditions:
1. Sheet 1 of 26: Please add book and page.
2. Sheet 4 of 26: Detail I, minimum slope for S3 is 1% and 2% max., revise.
3. Sheet 4 of 26: Detail I, Detail 205.5 indicates 3.5% for S1, revise.
4. Sheet 4 of 26: Detail H, no warp, 12:1 max, revise.
Note: Per your comment response letter, Previous gutter depression (previous comment 4 ) in Bike Lane approved by COT DOT Capital section Manager Andy McGovern.
10/02/2006 GARY WITTWER DOT LANDSCAPE REVIEW Approv-Cond The plans are approved. Please have the developer submit a letter of understanding to the City that the landscape and irrigation installed by the developer within the ROW will be maintained by the developer or HOA.
10/09/2006 THAUSER1 CONSTRUCTION ESTIMATE REVIEW Needs Review
10/13/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
10/27/2006 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
10/27/2006 TAMI HAUSER ENGINEERING REVIEW Completed
10/27/2006 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed