Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T06PI00008
Review Name: PIA RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/22/2006 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | 3/22/2006 The following items, at a minimum, must be addressed in the next submittal (Tully Elem School Bus Bay T06PI00008). 1. Plans call out 14" curb reveal but existing as-built plan (I-90-38) and field inspection noted 6" curb reveal? The proposed "bump-out" curbing must match surrounding curbing reveal and type. 2. Call out concrete slab slope in section A (minimum 1%, maximum 2%). |
| 03/29/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | We have reviewed these plans and have the following comments: Previous comments have been addressed. No further comments. 3/29/06 |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Passed | |
| 03/31/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Passed | |
| 03/31/2006 | DALE KELCH | DOT TRAFFIC | REVIEW | Approved | Traffic Engineering recommends APPROVAL of this PIA submittal. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Passed | |
| 03/31/2006 | THAUSER1 | CONSTRUCTION ESTIMATE | REVIEW | Needs Review | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Passed | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Passed | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Passed | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Passed | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Passed | |
| 03/31/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Passed | |
| 04/03/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
| 04/03/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |