Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/23/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
05/23/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY CLEARANCE LETTERS |
06/12/2006 | DALE KELCH | DOT TRAFFIC | REVIEW | Approved | The comments from the two previous submittals have been incorporated into the plans. Traffic Engineering approves these plans. Diahn L. Swartz, P.E., PTOE Traffic Engineering Project Manager City of Tucson 201 N. Stone Ave, 5th Floor PO Box 27210 Tucson AZ 85726-7210 (520) 791-4259 (520) 791-5526 Diahn.Swartz@tucsonaz.gov |
06/15/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed these plans and have the following comments: Sheet 2 of 4 - Placito de los Aviones and Fontana Ave refer to details A/4 and B/4 respectively. These should be A/3 and B/3. Sheet 2 of 4 - Who will be responcible for maintaining common area "A"/ detention area? If the City will be responcible, we will need an access point for maintenance. No further commnets. 6/15/06 |
06/21/2006 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | Fontana Estates T06PI000002: The following comments (6/21/2006), at a minimum, must be addressed in the next submittal. 1. Sheet 2 of 4: Detail call-out A/4 is not in sheet 4? Please revise. 2. Sheet 2 of 4: Detail call-out B/4 is not in sheet 4? Please revise. 3. Sheet 3 of 4: Section A/2 states 3.5" AC over 4" ABC, will the AC be placed in one lift? 4. Sheet 3 of 4: Detail 3, why is an easement needed for the sidewalk? Revise detail (like detail 2) so as to keep the sidewalk and ramp within the r/w. 5. Sheet 3 of 4: Detail 1, why is this detail needed? Remove detail if not needed. 6. Sheet 3 of 4: Detail 2-Plan View, call out curb transition. 7. Sheet 3 of 4: Detail 2-Plan View, this detail calls out for warped sidewalk transition from existing sidewalk to new ramp? The sidewalk must not be warped. Revise detail so that transition is in compliance to ADA requirements. 8. Sheet 4 of 4: Detail E/4, indicate scupper railing and r/w line. 9. Sheet 4 of 4: Detail 4, include removable post barricades for the proposed detention base access. 10. Sheet 4 of 4: Detail D/4, proposed depressed sidewalk is not acceptable. Provide flows under the sidewalk (via a scupper) for the 10-year event. |
07/03/2006 | THAUSER1 | CONSTRUCTION ESTIMATE | REVIEW | Needs Review | |
07/03/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
07/03/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |