Plan Number: T06PI00002
Parcel: Unknown

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T06PI00002
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/23/2006 TAMI HAUSER ENGINEERING REVIEW Needs Review
05/23/2006 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Denied SUBMIT UTILITY CLEARANCE LETTERS
05/23/2006 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Denied SUBMIT UTILITY CLEARANCE LETTERS
06/12/2006 DALE KELCH DOT TRAFFIC REVIEW Approved The comments from the two previous submittals have been incorporated into the plans. Traffic Engineering approves these plans.



Diahn L. Swartz, P.E., PTOE
Traffic Engineering Project Manager
City of Tucson
201 N. Stone Ave, 5th Floor
PO Box 27210
Tucson AZ 85726-7210

(520) 791-4259
(520) 791-5526

Diahn.Swartz@tucsonaz.gov
06/15/2006 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed these plans and have the following comments:

Sheet 2 of 4 - Placito de los Aviones and Fontana Ave refer to details A/4 and B/4 respectively. These should be A/3 and B/3.
Sheet 2 of 4 - Who will be responcible for maintaining common area "A"/ detention area? If the City will be responcible, we will need an access point for maintenance.

No further commnets. 6/15/06
06/21/2006 Estevan Tineo DOT ENGINEERING REVIEW Denied Fontana Estates T06PI000002: The following comments (6/21/2006), at a minimum, must be addressed in the next submittal.

1. Sheet 2 of 4: Detail call-out A/4 is not in sheet 4? Please revise.
2. Sheet 2 of 4: Detail call-out B/4 is not in sheet 4? Please revise.
3. Sheet 3 of 4: Section A/2 states 3.5" AC over 4" ABC, will the AC be placed in one lift?
4. Sheet 3 of 4: Detail 3, why is an easement needed for the sidewalk? Revise detail (like detail 2) so as to keep the sidewalk and ramp within the r/w.
5. Sheet 3 of 4: Detail 1, why is this detail needed? Remove detail if not needed.
6. Sheet 3 of 4: Detail 2-Plan View, call out curb transition.
7. Sheet 3 of 4: Detail 2-Plan View, this detail calls out for warped sidewalk transition from existing sidewalk to new ramp? The sidewalk must not be warped. Revise detail so that transition is in compliance to ADA requirements.
8. Sheet 4 of 4: Detail E/4, indicate scupper railing and r/w line.
9. Sheet 4 of 4: Detail 4, include removable post barricades for the proposed detention base access.
10. Sheet 4 of 4: Detail D/4, proposed depressed sidewalk is not acceptable. Provide flows under the sidewalk (via a scupper) for the 10-year event.
07/03/2006 THAUSER1 CONSTRUCTION ESTIMATE REVIEW Needs Review
07/03/2006 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
07/03/2006 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed