Permit Number: T06OT01620
Parcel: 127042710

Address:
4938 E 4TH ST

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T06OT01620
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/06/2006 SUZANNE BOHNET ENGINEERING REVIEW Denied To: Bodie Robins
DATE: July 7, 2006
FROM: Suzanne Bohnet, CFM
Engineering Division

SUBJECT: 4938 E. 4th St.
Addition to existing pre-FIRM structure
Floodplain Use Permit No. T06OT01620
Related Permit No.T06CM02865
T14S, R14E, Section 11

RESUBMITTAL REQUIRED

The Floodplain Use Permit cannot be approved as submitted. Please include a response letter to the comments along with the corrected copies of the SP with your next submittal.

Floodplain Use Permit comments:
1. The Drainage Statement, sealed by William J. Strang of Physical Resource Engineering, Inc. dated 5/1/06, contains a firmette of the Flood Insurance Rate Map (FIRM) panel 04019C2232K, submitted as Exhibit 5. However, the firmette does not reflect the current floodplain. The subject property lies within a Letter of Map Revision (LOMR) area, dated July 24, 2000, that changed the flood zone, the water surface elevation and the floodplain boundaries. The subject property is within a mapped Federal Emergency Management Agency (FEMA) floodplain Zone AE (not Zone AH as noted on the copy of the FIRM panel included in the report). Please revise the Drainage Statement to report the current effective Base Flood Elevation (BFE) for lowest Finished Floor Elevation (FFE) requirements. Also, please include a correct copy of the FIRM panel as the attachment.

Site Plan:
1. Please include on the Site Plan the FEMA flood zone (Zone AE), the BFE and the FFE, including the vertical datum used for the elevations.

Please note that a condition of the Floodplain Use Permit will be submittal of Elevation Certificates to verify the elevation of the lowest finished floor. The first Elevation Certificate will need to be returned to this office prior to the pouring of the first slab and the second Elevation Certificate is required after construction is complete and the machinery servicing the building is in place.

If you have any questions, I can be reached at 791-5550 x1188.
Suzanne Bohnet, CFM, Engineer Associate
Suzanne.Bohnet@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
07/14/2006 SUE REEVES OUT TO CUSTOMER Completed