Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T06OT00774
Review Name: SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/24/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/04/2006 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit NPP plan or application for exception per DS 2-15.0 |
04/04/2006 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | Submit NPP plan or application for exception per DS 2-15.0 |
04/18/2006 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: April 18, 2006 SUBJECT: Starr Pass Comfort Station Engineering Review LOCATION: T14S R13E Section 17 REVIEWER: Elizabeth Eberbach ACTIVITY NUMBERS: T06BU00669, T06OT00774 SUMMARY: The review package with a copy of the approved Tentative Plat were reviewed by Engineering. Engineering recommends approval of the project with the following conditions added to the permits: PERMIT CONDITIONS: 1) Extents of disturbance for this proposed improvements shall be fenced at the site. Fencing will not be placed within the floodplain limits. 2) Interim erosion control devices shall be placed at downstream end of disturbance between disturbance limits and wash area. 3) Any proposed sanitary sewer systems shall be constructed to prevent disease, contamination, and unsanitary conditions due to flooding and/or erosion. Area surrounding comfort structure shall be graded so as to not provide direct discharge of sanitary effluent to the wash. 4) An engineering grading pre-construction meeting shall be set up prior to grading construction of improvements under this proposed project. 5) Except as otherwise provided in the Floodplain Ordinance regulations, it shall be unlawful for any person to establish, erect, alter or relocate a use or structure in the regulatory floodplain or an erosion-prone area as described in Tucson Code section 26-11.1(2) without first obtaining a floodplain use permit from the city engineer. 6) It shall be unlawful for any person to perform any grading operation in or alteration of any watercourse in violation of the Floodplain Ordinance. There is no resubmittal required. Pick up permits after approvals from all review entities have been completed. You may call me if you have any questions, at 791-5550 extension 2204. Elizabeth Eberbach, PE, CPM Civil Engineer Engineering Division Development Services |
04/22/2006 | DAVID RIVERA | ZONING | REVIEW | Approved | |
05/12/2006 | DAVID RIVERA | ZONING HC SITE | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/25/2006 | GBONILL1 | OUT TO CUSTOMER | Completed |
05/25/2006 | SUE REEVES | REJECT SHELF | Completed |