Permit Review Detail
Review Status: Completed
Review Details: MOBILE HOME
Permit Number - T06MH00069
Review Name: MOBILE HOME
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/25/2007 | VFLORES1 | WWM | REVIEW | Needs Review | |
| 12/08/2006 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Approved | |
| 12/08/2006 | MICHAEL ST. PAUL | NPPO | REVIEW | Passed | |
| 12/08/2006 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 12/19/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Denied | DATE: January 24, 2007 SUBJECT: 1212 N Riverview Road- Manufactured Home Setup TO: ABC Mobile Movers LOCATION: T14S R13E Sec02, Ward 1 REVIEWERS: Jason Green, CFM ACTIVITY: T06MH00069 (Site Plan) and T06OT03281 (Floodplain Use Permit) SUMMARY: Engineering Division of Development Services Department has received and reviewed the Site Plan (T06MH00069) and Floodplain Use Permit (T06OT03281) for the above referenced property and does not recommend approval of the Site Plan or Floodplain Use Permit at this time. The subject property is entirely located within a Special Flood Hazard Area (SFHA), Zone AE as shown on the Flood Insurance Rate Map (FIRM), Community- Panel No. 040073-04019C-2226K, effective date February 8, 1999. Federal law requires that a flood insurance policy be obtained as a condition of a federally backed mortgage or loan that is secured by a building located within a SFHA. Per Section 26-5.2 of the Tucson Code no development, storage of materials or equipment or other uses shall be permitted which acting alone or in combination with existing uses, create a danger or hazard to life or property. In order to process your application for development within the floodway fringe of the El Rio Wash the following information is required: SITE PLAN: 1) TC Sec.26-9.a.1: Revise the submitted detail and the site plan to show that the bottom of the structural frame or the lowest point of any attached appliances, whichever is lower, is at or above the regulatory flood elevation (2323.4 feet NGVD 1929). Certification of elevation must be prepared by a state registered land surveyor and submitted to our office prior to electrical hook-up. 2) TC Sec.26-9.a.3: Revise the site plan to show that all service equipment, such as air conditioning, evaporating coolers, electrical and heating equipment servicing the manufactured home are elevated at or above the regulatory flood elevation (2323.4 feet NGVD 1929). 3) TC Sec.26-9.b: Revise the site plan to show the manufactured home securely anchored. Certification by a state-registered professional civil engineer that the installation of the manufactured home meets all the requirements of Section 26-9 of the Ordinance is required. 4) TC Sec.26-11.2.2: Provide an encroachment analysis prepared by a state-registered professional civil engineer outlining the effects the manufactured home setup will have on the flow of water through the area being developed and the surrounding areas. This analysis is for the purpose of evaluating possible flood hazards and shall include a discussion on the development to flood heights, water velocities, direction of flow, and erosion hazard setback from the bank of the regulatory wash. The placement of the manufactured home and method of elevation can not increase the base flood elevation more than one-tenth of a foot or cause other adverse impacts on the floodplain or surrounding properties. Provide the 100-year floodplain limits on the revised site plan. 5) TC Sec.26-8.d: Revise the detail to show how the manufactured home is proposed to be elevated. If the manufactured home is to be elevated on fill the building line shall be located not less than 25-feet landward from any edge of fill, unless a study prepared by a state-registered professional civil engineer and approved by the city engineer shows that a lesser distance is acceptable. The encroachment analysis must take into account the proposed method of elevation. 6) TC Sec.26-7: Provide an erosion hazard setback analysis from a state-registered professional civil engineer. Refer to the Standards Manual for Drainage Design and Floodplain Management in Tucson Arizona for erosion hazard setback requirements. The erosion hazard line must be shown on the revised site plan. GENERAL COMMENTS: Please be advised that since the subject property is located within the SFHA Zone AE floodplain, it will be required that an elevation certificate for the proposed manufactured home be filled out by an Arizona Registered Land Surveyor showing that the bottom of the structural frame or the lowest point of any attached appliances, whichever is lower, is above the regulatory flood elevation (one foot higher than the calculated water surface elevation of the base flood), and returned to our office. Please provide a revised site plan, a revised detail, an encroachment analysis, and an erosion hazard setback analysis that address the comments provided above. If you have any questions, I can be reached at 791-5550, extension 1189. Jason Green, CFM Senior Engineer Associate Engineering Division Development Services |