Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: ELECTRICAL
Permit Number - T06EL01048
Review Name: ELECTRICAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/01/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06EL01048 6/1/06 1. Instruct Permit Clerks to add Zoning and Engineering to WorkFlow. 2. Submit a site plan with all equipment located on a scaled drawing. 3. Show disconnect at structure. Reference NEC 225.31, 225.32. 4. Show grounding electrode system and compliance with NEC 250.32. 5. Demonstrate that the electrical load on the 100A panel does not exceed the rating of the 40AF at the disconnect. 6. Show the grounding electrode system at the service. 7. Show the service entrance conductors from the power company. Clarify whether the intent is to provide overhead or underground power. Note that power shall be UG unless an existing service is OH. 8. Provide TEP available fault current at the service. 9. Indicate fault current rating on all equipment. 10. Demonstrate that all equipment is within its fault current rating. 11. Indicate voltage and phase of service. |