Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM06560
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/24/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show the mixing valve for the lavatory, P2. 2. Coordinate the plumbing plan and the riser diagrams. |
01/24/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the total amount of outside air per footnote (f) of Table 403.3, IMC 2003 (1.5x the floor area of the kitchen). 2. How is the evap cooler to provide make up air for the hood during the winter and still comply with Section 508.1, IMC 2003? |
01/24/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM06560 1/24/07 1. Ckt A-3 powers lights according to the Lighting Plan, and receptacles according to the panel schedule. Please clarify. 2. Water Heater takes 240V power per Sheet P1.1, and 208V power on the electrical panel schedule. Please coordinate with Plumbing and clarify. 3. WH-1 can't be on 2 single pole breakers is it is a line-to-line load. 4. Ckt B-3 powers a receptacle according to the Power Plan, and lights according to the panel schedule. Please clarify. 5. Provide overcurrent protection for the Walk-In Freezer Condenser per NEC 422.11 (E) (3). 6. Provide overcurrent protection for the Walk-In Freezer Fan per NEC 422.11 (E) (2). 7. Provide overcurrent protection for the Walk-In Cooler Fan per NEC 422.11 (E) (2). 8. Clarify electrical loads on panel A, ckt 12,14. One is 1000VA, the other is 1800VA. 9. Show current location of panel B and indicate location of electrical service. 10. If panel B is moved closer to the electrical service, provide fault calculations. |
01/30/2007 | DROBEY1 | WWM | REVIEW | Needs Review | |
01/30/2007 | DROBEY1 | BUILDING-COMMERCIAL | REVIEW | Passed | |
01/30/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/30/2007 | DELMA ROBEY | APPROVAL SHELF | Completed |
01/30/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
01/30/2007 | DELMA ROBEY | REJECT SHELF | Completed |