Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM06535
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/12/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Specify size and type of C-1 on structural pages per 13 of 22 in structural calculations. (Ref: previous correction note #5) 2) Justify south wall per table 602 and table 704.8 of the 2003 IBC. "Existing" is not viable justification. (Ref: previous correction note #13) |
| 07/17/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation. Reference Section 104.2, IECC 2003. |
| 07/17/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2003, for business occupancy (e.g. a drinking fountain). 2. Provide the material standards for all plumbing fixtures and faucets. Reference Section 401.1, UPC 2003. 3. Comment not addressed on the architectural sheets. Show that the floor of the restroom slopes toward the floor drain. Reference Section 412.2, UPC 2003. 4. General plumbing note #5 indicates that "In all instances, material as approved by the Arizona State Plumbing Code shall be allowed". If a different material piping material is to be used, the pipe sizes for the water distribution system may have to be modified. Reference Section 610.1, UPC 2003. 5. Show how the Eemax 2412 instantaneous water heater is able to limit the hot water temperature at the lavatory per Section 414.1, UPC 2003 and Section 804.3, IECC 2003. |
| 07/18/2007 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 07/23/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 07/27/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. HP-1 is 24 MCA on the Heat Pump Split System Schedule. Electrical Panel Schedule load information indicates 38A. Coordinate with Mechanical and clarify. 2. Provide an electrical circuit for FC-1. Coordinate electrical requirements with Mechanical. 3. Put Fixture H on the Luminaire Schedule. 4. Provide Panel/Circuit number for ceiling fans. 5. Fill in load on panel schedule for Ckt MP-5. 6. Please note that on the line side of the service disconnect, it is a BOND, not an equipment GROUND. Reference Sheet E1. |
| 08/02/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS 8TH FLOOR CREDIT EVALUATION |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/23/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 08/23/2007 | CINDY AGUILAR | REJECT SHELF | Completed |