Permit Number: T06CM06431
Parcel: 107020220

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T06CM06431
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/12/2007 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: T06CM06431
3207 N. Freeway Industrial Loop
Site Plan

TRANSMITTAL: 04/12/07

COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


1. Provide on the detail for the handicap parking spaces the maximum slope of the parking space and access aisle per ANSI 117.1-2003. Maximum slope is 1:48.

2. In the parking calculations change the proposed use to commercial storage.

3. The above required changes are minor and this plan can be reviewed and approved over the counter once the changes have been made. Please call to set an appointment with me in order to complete this project.


If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

TLS C:\planning\cdrc\DSC\T06CM06431.doc
04/12/2007 TERRY STEVENS ZONING HC SITE REVIEW Denied see zoning comments.
04/26/2007 ANDREW CONNOR LANDSCAPE REVIEW Denied 1. Replicate on current submitted document the landscape indicated in the approved plans Case # S99-053 on Sheet L4.

2. All landscape areas will be depressed to accept water flow from roofs, PAAL, and parking areas. Show by detail or spot elevations how landscape areas will accommodate water harvesting.

3. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape & grading plan.
05/03/2007 JASON GREEN ENGINEERING REVIEW Denied DATE: May 21, 2007
SUBJECT: Border Products Storage Yard Site Plan- 2nd Engineering Review
TO: Tim Puntenney
LOCATION: 3207 N Freeway Industrial Loop, T13S R13E Sec27, Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: T06CM06431


SUMMARY: Engineering Division of Development Services Department has received and reviewed the submitted site plan, preliminary grading plan, Drainage Statement (prepared by Bogardus Engineering, LLC, dated February 8, 2007 and Stormwater Pollution Prevention Plan (SWPPP). The preliminary grading plan was not reviewed for Development Standard (DS) Section 11-01, grading compliance. The site plan is not approved at this time. Please address the following comments:


SITE PLAN COMMENTS:

1) DS Sec.10-02.2.3.1.2.D: The drainage Statement prepared by Bogardus Engineering, LLC has been reviewed for conformance with the drainage patterns and drainage scheme for Freeway Industrial Park, B54P018. The statement shows that the drainage design for this project does not alter or impede the on-site or off-site flows and discusses the rock riprap inlets along the existing drainage channel with rock sizing and method of placement.
2) DS Sec.10-01.2.2: Provide a geotechnical report with infiltration rates for the existing retention basin. Per activity T05BA00047, the existing basin has garbage, debris, and erosion occurring at the inlet. The existing basin has been silted in with sediment causing void space to be filled in and reducing drain down time for storm water runoff. After the basin has been properly maintained new percolation test are required from a geotechnical engineer showing that the basin meets the maximum allowed disposal time per DS Sec.10-01.3.5.1.


GENERAL COMMENTS:

Please provide the percolation rates within a geotechnical addendum that address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

Further comments may be generated upon resubmittal of the geotechnical addendum reviews. Please enclose "redlines" with the resubmittal package for reference.

For any questions or to schedule a meeting, call me at 791-5550, extension 1189.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
05/30/2007 VFLORES1 OUT TO CUSTOMER Completed
05/30/2007 VFLORES1 REJECT SHELF Completed