Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T06CM06288
Parcel: 125090230

Review Status: Active

Review Details: COMMERCIAL TI

Permit Number - T06CM06288
Review Name: COMMERCIAL TI
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
01/24/2007 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied 1) Provide a dimension floor plan clarifying cooridor widths.
2) Clarify scope of work completed without permits per inspection report issued from denied C of O and last approved floor plan. (From rear corridor to front of cash register is new) Provide electrical, plumbing, and mechanical plans accordingly.
3) Clarify occupant load.
4) Justify 20% cost of construction spent towards accessibility see section 3409.6 provide breakdown of cost and items on drawings.
4)
12/13/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide additional information to clarify the operation of the two Type I hoods and the make up air (e.g. air flow rates for each). Indicate the required amount of outside air to be provided by the roof top unit.
12/13/2006 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T06CM06288 12/13/06

1. Provide panel and circuit number for all new electrical loads.
2. Provide full panel schedule and load calculations.
3. Clarify electrical connections, that is plug-in vs. hard-wired.
4. Provide disconnects for appliances. Reference NEC 422 Part III.
12/13/2006 ROBERT SHERRY WATER REVIEW Approved
12/13/2006 ANY ZONING REVIEW Active
12/13/2006 ANY WWM REVIEW Active
12/13/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Provide additional information to evaluate the drain piping for the kitchen and the gas piping.
12/13/2006 ANY ENGINEERING REVIEW Approved
12/13/2006 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Active
12/13/2006 ANY FIRE REVIEW Active