| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/23/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project# T06CM06267 4415 S TH The revision has been denied for the following reasons,reply to each item individually and address how each was resolved. 1.The electrical sheet is missing in one set of plans. 2.Item #6 poses a problem, the system voltage at the main service appears to be a 120/240volt 3-phase Delta system with a high leg of 208 volts.As per the following sections in the 2005 NEC the high leg is required to be identified ( orange ),110-15,230-56,4087.3,409.102. This high leg phase is required to be on the B phase per the NEC< and on the C phase per the utility.Panel should not have the high leg in it due to the fact that it will give 208 volts to neutral on any 120 volt circuit.Will you please clarify this on the plan. Ray T Majuta DSD Electrical Plan Check City of Tucson 520-8374988 10/24/08 |
| 10/24/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Indicate the extent of the mechanical revisions (revision 4, "cooler removal") by clouding the revisions on a clean copy (i.e. not showing any previous City of Tucson or Pima County approval stamps) of the affected drawings. Redraw as required to clearly show the revised conditions. The current registrant shall clearly indicate the extent of the design for which he is taking responsibility. |
| 10/24/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT FROM SHEET T-1. SHOW ACCESSIBILITY ROUTE FROM REAR EXIT AROUND BUILDING TO FRONT ENTRANCE. 2. PREVIOUS COMMENT FROM SHEET A-1. DOOR AND RAMP TO DELIVERIES ROOM ARE IN THE WRONG LOCATION. REVISE. 3. PREVIOUS COMMENT FROM SHEET A-1. DIMENSION VERTICAL GRAB BAR IN RESTROOM. 4. PREVIOUS COMMENT. PROVIDE NEW SEALS/SIGNATURES FOR ALL REVISED SHEETS. 5. PREVIOUS COMMENT. PROVIDE RESPONSE LETTER TO BUILDING REVIEW COMMENTS. 6. ARCHITECT MUST CONTACT DEVELOPMENT SERVICES DEPARTMENT TO ARRANGE MEETING TO DISCUSS COMPLETION OF THIS PROJECT. |
| 10/24/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. The use of PVC pipe for water distribution is not approved inside of a building. Reference: Section 604.1, UPC 2003. 2. The revised drawing does not include the revisions to the waste piping and does not identify the fixtures (e.g. P3, P4, and the service sink).Provide a plan of the revised waste piping, an isometric waste and vent diagram, and a schedule of the plumbing fixtures. Reference: Section 103.2.3, UPC 2006. |